Fig.#16
Fig.#15
150
10
250 10
Close by rotating the handle clockwise and
open counterclockwise
Handle of tee valve
Tee valve
Decorative cover
J.
2.
Install Tee Valve.
IMPORTANT!
1.
Dimensions in the pictures are for reference only.
Install Deco Cover.
Unit: mm
1.
Connect the water outlet.
2.
Open the shut-off valve.
NOTE: Please do not reuse the old hose.
K.
Connect the Water
IMPORTANT!
The supplied hose must be used for this installation.
1243902-KR01-
D
10
Kohler Co.