background image

, 2011

Copyright Kohler China Ltd., 2011

1) Unpack bath shell and skirt and check for any transit

damage prior to installation.

2) Position the bath shell in the desired location in the

bathroom.

3) Check that the plumbing can be connected to the

bath when in the desired location.

4) Reaching under the bath, slide the feet clips onto

the feet as they would be when the bath is clipped in.
Check that the clips are all oriented in the same
direction and then mark around the feet with a
marker pen.

1)

2)

3)

4)

INSTALLATION

INSTALLATION INSTRUCTIONS

FREE STANDING BATH

K-45346T

368

201419

-1-

·

·

·

·

Please read these instructions carefully to
familiarize yourself with the required tools, materials,
and installation sequences. Follow the sections that
pertain to your particular installation. This will help
you avoid costly mistakes. In addition to proper
installation, read all operating and safety instructions.
All information is based on the latest product
information available at the time of publication.
Kohler China Ltd. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
These instructions contain important care, cleaning,
and warranty information-

Please provide adequate available space for the
bath unit in accordance with rough-in. Arrange the
location of drain in advance.

All installations must comply with council and local
authority by-laws. It is the responsibility of the installer
to ensure that the waste is made watertight by means
of silicone sealant or caulking compound.

Bath drain supplies should be arranged preliminarily
according to the selected bath.

please leave these

instructions for the consumer.

IMPORTANT:

NOTE:

Bath can be installed after the wall is completed.

·

·

·

·

BEFORE YOU BEGIN

1175503-T01-A

Отзывы: