Prepare the Site (cont.)
IMPORTANT!
When installing the supply hose, connect it to the toilet first, then the supply stop.
NOTE:
The supplied water supply hose is 18
″
(457 mm) in length. The supplied hose must be used for
this installation.
Install the water supply and supply stop.
Install a water hammer arrestor to the supply stop or water supply line.
Flush the water supply line into a pail or other container to remove all debris.
Install the Electrical Service
NOTE:
The suppled power cord is 56
″
(1422 mm) in length.
Locate a dedicated 120 V, 15 A minimum, 60 Hz grounding-type receptacle, protected by a GFCI or
RCD, within 56
″
(1422 mm) of the back of the toilet.
Install External Speaker Wires (optional)
If external speakers will be used, install the speaker wires at this time.
Kohler Co.
9
1212876-2-B