1015072-2-
A
4
Kohler Co.
Escutcheon
Valve
Body
Hose
Nut
Washer
Shank Tee
Plumbers
Putty
2. Valve Body/Tee Installation
-
Apply thread sealant to the coupling nut threads of the flexible
hoses, and thread the flexible hoses to the valve body outlets.
-
Tighten securely, but do not overtighten.
-
Apply a bead of plumbers putty or other sealant to the undersides of
the handle escutcheons according to the putty manufacturer’s
instructions.
-
Insert the valve bodies into the mounting holes from the top of the
sink. Make sure the hot valve body (marked red) is installed in the
left-hand hole (as viewed from the front of the sink).
-
Install a washer and nut to the bottom of the valve bodies.
-
Align the valve bodies so the copper tubing faces to the outside.
-
Wrench tighten the nuts.
-
Remove any excess plumbers putty.
-
Connect the hoses to the shank tee, and tighten.