3. Complete the Installation
Secure Frame
Square the frame to the rim of the bath/whirlpool.
Secure the sides of the frame to the studs with the screws provided. Shim as necessary to fill any
gaps.
Secure the bottom of the frame to the subfloor with screws or floor anchors. Shim as necessary to fill
any gaps.
Thread the carriage bolt out until it makes contact with the bath/whirlpool. Then secure by
threading the nut up against the backside of the support structure.
Secure Panel
Center the panel on the frame. Press the panel onto the frame so that each of the fasteners engage.
Finish the Installation
Install water-resistant wall material [1-1/2
″
(3.8 cm) maximum thickness] to complete the finished
wall.
Install flooring material [2
″
(5.1 cm) maximum thickness] to complete the finished floor.
Service
Using a flat-blade screwdriver, gently pry the bottom of the apron panel away from the apron
frame.
Panel
Frame
Fastener
Carriage
Bolt
Bath/Whirlpool
Square
Panel
Flat-Blade
Screwdriver
Frame
Support
Structure
Screw
Service
Secure Frame
Secure Panel
Kohler Co.
5
1011309-2-C
Содержание K-1243
Страница 14: ...1011309 2 C ...
Страница 15: ...1011309 2 C ...
Страница 16: ...USA Canada 1 800 4KOHLER México 001 877 680 1310 kohler com 2008 Kohler Co 1011309 2 C ...