Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few minutes to review this manual before
you start installation. If you encounter any installation or performance problems, please don’t hesitate to
contact us. Our phone numbers and website are listed within this manual. Thanks again for choosing Kohler
Company.
Tools and Materials
Before You Begin
Please read these instructions carefully to familiarize yourself with the required tools, materials, and
installation sequences. Follow the sections that pertain to your particular installation. This will help
you to avoid costly mistakes.
Observe all local plumbing and building codes.
Locate the rough plumbing for the drain in accordance with the roughing-in dimensions for your
particular model.
A variety of installations are possible. These instructions show suggested installation procedures.
Your particular installation may require other construction techniques.
Your shower receptor comes packaged in a single carton. This carton will fit through any standard
door. You should not remove the receptor from the carton until you are ready to install it.
Unpack and inspect the shower receptor for any damage. The receptor should have a front apron
piece already secured to it. This apron does not need to be removed and can remain attached
throughout the installation procedure. If you find any damage, do not install the receptor. Report
the specific problem to your dealer immediately.
After inspection, return the receptor to the carton until you are ready to install it.
The shower receptor must be installed to an adequately supported and level subfloor.
Be sure that you have enough access to move the receptor into the construction area.
Make sure the installation area is clean and free of all debris. If remodeling, remove all finished wall
material to expose the stud wall/framing and remove all floor coverings to expose the subfloor.
Provide properly dimensioned framing.
This shower receptor is designed for an alcove installation.
The exact location of the end studs will depend on the thickness of the finished wall material.
Plus:
• Common Woodworking Tools and Materials
• Galvanized Nails/Screws
• Drop Cloth
• 2x4s and/or 2x6s
*
• Water-Resistant Wall Material
• Furring Strips
• Wood Shims
*
Required for installations with grab bars.
Pencil
Level
Silicone
Sealant
Plumbers
Putty
Knife
Square
Screwdriver
Drill
Safety
Glasses
Tape
Measure
Claw
Hammer
Pipe
Wrench
1065122-2-A
2
Kohler Co.