3
Position the cistern on the pan
by centering the gasket on the
pan inlet. Securely tighten the
screws so the cistern is level.
4
Connect the supply hose to
the cistern inlet and feed the
hose through the appropriate
side hole in the pan.
5
Connect the supply hose to the shut-off valve to test the system
for leaks. Shut off the water supply and disconnect the hose. Insert a
capping plug into the unused hole.
1
Remove the Side Inlet valve and 250mm hose.
2
Install the Bottom Inlet valve to the cistern. Discard the bung. Place
the washers over the fixing screws and locate in cistern fixing holes.
Capping Plug
Water Supply Hose
(Not supplied)
Gasket
Screw
Pan Inlet
NOTE:
Bottom Inlet Valve
has been preset to
deliver a full flush
volume of 4.5L.
Side Entry Holes
Bottom
Inlet
Valve
Washer
Seal
Nut
Captivated Nut
(in pan)
Rubber Seal
Washer
Fixing Screw
CISTERN INSTALLATION - BOTTOM INLET
ENGLEFIELD
4
INSTALLATION INSTRUCTIONS
EVORA
TM
Back-to-Wall Toilet Suite
ENGLEFIELD
5
Skip this page if installing a
Top Rear Entry cistern configuration.