1265598-2A-A
2
1265598-2A-A
3
INSTALLATION
CLEANING INSTRUCTIONS
All Finishes: Clean the finish with mild soap and warm water. Wipe entire surface completely dry with clean soft
cloth. Many cleaners may contain chemicals, such as ammonia, chlorine, toilet cleaner etc. which could adversely
affect the finish and are not recommended for cleaning.
Do not use abrasive cleaners or solvents on Kohler faucets and fittings.
INSTALLATION CHEKOUT
How to Install the Faucet
To perform installation, installer must provide G1/2˝
female supply
fittings(1), spaced 150mm apart and horizontal. The supply fittings should
be vertical and not beyond the finished wall. Hot supply pipe must be
located on the left.
Flush the water supply pipes thoroughly to remove any debris.
Install the two offset connectors(2) into the hot and cold supply pipes.
Use appropriate thread sealants or thread tape on pipe threads.
Adjust the center-to-center distance between the connectors to 150mm
and horizontally. They should extend 29mm beyond the finished wall.
Thread the escutcheons(3) onto the connectors until against the finished
wall.
Put the washers(4) into the nuts(5), thread the nuts to connectors.
Tighten the nuts with strap wrench or soft cloth between product and
regular wrench.
How to Install the Shower Column
Select a location in vertical wall to install shower column according to
rough-in dimensions.
Drill the lower hole as anchors(6) diameter and lower base(8-1) position
in the finished wall(
NOTE:
The arrow in the base is upward). Press
anchors into the hole, secure the base by the screw(7).
Rehearse the slide bar kit(9) installation for the upper base(8-2) mounting
location determination. Slide the tube joint(10) onto the slide bar kit, and
connect them to the base(
NOTE:
The arrow in the base is upward).
Install the screws(12) into the tube joint with the hex wrench(11), and
tighten them.
Place the slide bar and the body against the finished wall. Connect the
lower base and the diverter body kit(13). Position and tighten them by
hex wrench. Mark the hole of upper base(8-2) with a pencil. Uninstall the
slide bar kit and tube joint.(
NOTE:
Don’t lose the screws.)
Drill holes on the mark. Press the anchors into the holes. Secure the
upper base(8-2) by the screws. Install the tube joint(10) to the base(8-2)
and tighten them by screws. Reinstall the slide bar kit with
escutcheons(14) to the bases. Tighten the screws with the hex wrench.
Screw the escutcheons with the bases until against the finished wall.
Install the tube kit(15) into the slide bar kit. Install the nut(16) onto the
tube kit with soft cloth between internal hole of the nut and tube kit.
Then screw the nut onto the slide bar kit with strap wrench or soft cloth
between the nut and regular wrench.
How to Install the Handspray and Hose
Tighten 500mm length hose(18) to the outlet(19) and connector(20) with
two washers(17).
Turn the diverter handle(21), run hot and cold water for one minute to
remove any debris.
Tighten 1500mm length hose(24) to the connector(23) with filter
washers(22). Put the restrictor(25) into the handspray(26) inlet if needed.
Tighten the hose to the handspray with the filter washer(22).
Ensure that all connections are tight. Ensure that the handles are in the
off position.
Turn on the drain and main water supply, and check for leaks. Repair as
needed.
Remove the aerator assembly(30). Run hot and cold water through spout
about one minute to remove any debris. Clean the aerator assembly.
Shut off the faucet. Reinstall the aerator assembly.
How to Install the Showerhead
Turn the diverter handle for showerhead and run hot and cold water for
one minute to remove any debris before the showerhead(27) is installed.
Tighten the showerhead onto the tube kit outlet with strap wrench.
Before installation, install restrictor(28) if needed. Take out washer(29)
and install restrictor as shown, reinstall the washer.
150mm
Hot
Cold
3
2
1
5
4
16
15
6
7
12
8-2
14
6
7
12
8-1
14
13
10
11
9
30
22
25
26
24
17
20
21
22
23
17
18
19
28
27
29