
2
.
(
3
)
2
. Remove the dust-proof covers from the valve and install
the inlet/outlet connections. The outlet connector shall face
away from the wall and at the center of the urinal. Place the
flushing valve box into the slot, adjust its level and square
with battens. Then screw down the nut at the inlet and
outlet position. The connections please refer to the rough-
in in page 3.
W
R
ater Supply( ecommended Inner
Diameter Is More Than 20mm)
(
20mm)
Inlet Connection
Nut
Battens
Outlet Connection
Nut
AC Power Unit
Connect control box while
installing 8787T-C03
8787T-C03
Outer diameter
of bushing is no
more than 25mm
25mm
-4-
Please directly reference to Step 3 when installing 8787T-
C01 (DC).
Please match 16305T-NA AC power unit when installing
8787T-C03 (AC). The way of installation is as below.
a. Outlet of AC power unit upward prohibited.
b. Do not connect 220V AC power supply to DC wiring
terminal.
c. Do not damage the covering of AC power unit or
remove screws to avoid leakage.
CAUTION:
Outlet downwards
Outlet upwards
Connect to
sensor
Connect to AC
Power supply
A
.
1
2
Connect to AC
Power supply
8787T-C01(
)
3
8787T-C03(
)
16305T-NA
a.
b.
220V
c.
A
. Fig. #1: AC power unit connection way 1:
AC power unit is directly connected to electric control box.
Fig. #2 : AC power unit connection way 2:
AC power unit is connected to electric control box by
connection wire.
Connect to
sensor
Fig. #2
2
AC
AC
Connector
16305T-NA
AC power unit
16305T-NA
AC Power Unit
Connector
Wire prepared
by customer
Connect with the same color
,
and protect connect area by insulation tape.
wire
Connector
Fig. #1
1
1020018-T01-C