-8-
1271693-T01-F
F
i
r
st
T
i
m
e
S
etu
p Pr
o
c
edu
r
e
!
!
!
!
!
Plug the transformer into a 220 Volt, 50 Hz, Electrical
Outlet. The screen take up to 2 minutes to initialize,then
show standby display.
Set current date and time.
Set the language and region.
Set raw water hardness and people number.
Advanced settings (If Necessary).
!
When the setup is complete, the circuit board
microprocessor automatically calculates softener capacity.
Then transitions to the home screen, and the screen
displays the initializing status and the current date and
time.
!
!
!
!
!
220
50
,
2
(
)
!
N
ote
: Th
e de
f
ault
p
a
r
a
m
ete
r
s in ad
v
an
c
ed settin
g
s a
r
e
a
ppr
o
pr
iate
f
o
r m
ost
c
o
mm
on installations
.
N
ote
: S
alt sto
r
a
g
e
h
ei
gh
t s
h
ould not
b
e too
h
i
gh.
T
est
Sy
ste
m
Fig.#7
7
!
!
!
!
!
!
!
!
!
!
!
Ensure that all faucets at the installation site are closed.
Direct the drain line discharge into a bucket where flow
can be observed.
Open the main supply valve.
Initiate an immediate regeneration to move the control into
the BACKWASH position.
When in the BACKWASH position, slowly turn the bypass
on, allow the media tank to fill slowly until water flows from
the drain line.
When flow to drain is established, open the bypass fully.
Watch the drain line discharge for signs of impurity no
longer appears in the discharge.
After the BACKWASH runs clear, step the control to the
REFILL position to fill the brine tank and purge air from
the brine line.
Initiate an immediate regeneration again.
To observe the following step "Brine" is correct or not.
Pour salt into the brine tank, and Inform the customer
must add the salt before it be used up (Refer to Figure 7).
Complete the installation and cleanup.
!
!
!
!
!
!
!
!
!
!
!
(
7)
N
ote
: S
etu
p Pr
o
c
edu
r
e a
cc
o
r
din
g
to t
h
e
f
ollo
w-
u
p g
uide
.
Содержание Aleutian K-96025T-PS511-01R
Страница 22: ...1271693 T01 F 2021 3 31 ...