1293177-AN2-B
2
1293177-AN2-B
3
INSTALLATION
CLEANING INSTRUCTIONS
All Finishes: Clean the finish with mild soap and warm water. Wipe entire surface completely dry with clean soft
cloth. Many cleaners may contain chemicals, such as ammonia, chlorine, toilet cleaner etc, which could adversely
affect the finish and are not recommended for cleaning.
Do not use abrasive cleaners or solvents on Kohler faucets and fittings.
Flush the water supply pipes thoroughly to remove debris
before installation. Shut off the main water supply. Determine
a suitable location on the wall to install the valve body.
Be sure the valve body(1) is in correct direction. During
installation, keep valve protectors(2) on valve body.
The Min. and Max. dimensions between the centerline of the
valve and the outside of the finished wall are decided by trim
selection.
NOTE:
Ensure the valve is horizontal, and perpendicular to
the wall.
Supply enough tape or sealant to all connections. Connect
R1/2
˝ hot and cold supplies, showerhead and bath pipings
to valve body. Connect hot supply to the end on the left.
Install temporary nipples for showerhead and bath spout.
During installation, keep valve protector on valve body.
1
2
2
1
Min.
Max.
Min.
Max.
115
Handspray or bath spout
Showerhead
Showerhead
Hot
Hot
Cold
Cold
78980T-DR
Rc1/2˝
Rc1/2˝
Rc1/2˝
Centerline of valve
Decided by trim selection
To ground 1220 (Dual show
er faucet)
To fringe of bath 370 (Bath shower faucet)
64
Rc1/2
˝
14
36
51
25.5
36.5
78.5
148
65
65
55
55