TP-5700 7/93
14
Section 4 Air Requirements
4.4 Air-Vac
Cooling System
The air flow direction with the Air-Vac
system is the
opposite of the conventional forced air cooling system.
Use the Air-Vac
system in confined areas since it
includes a blower scroll which easily connects to the
ductwork. For duct dimensions refer to the dimensional
drawing for your model. With Air-Vac
cooling, air is
drawn across the generator end of the unit, into the
finned areas, and then out into the scroll located at the
front of the engine.The heated air is forced through
ductwork to the outside of the building. See Figure 4-6.
Note:
Order Air-Vac
cooling systems factory installed
since major components of the engine are
affected making it difficult and uneconomical to
install at a later time.
TP-5700-4
1
2
3
4
5
1. Air-Vac
scroll
2. Air inlet opening
3. Ductwork
4. Register type cover suitable for smaller sets
5. Flexible section
Figure 4-6
Air-Vac
Cooling System
Содержание 20-2800 kW
Страница 1: ...Industrial Commercial Residential Generator Sets Models 20 2800 kW TP 5700 7 93d Installation ...
Страница 12: ......
Страница 18: ...TP 5700 7 93 6 Section 2 Load and Transport Notes ...
Страница 22: ...TP 5700 7 93 10 Section 3 Location Notes ...
Страница 36: ...TP 5700 7 93 24 Section 5 Exhaust System Notes ...
Страница 55: ......