![KOHJINSHA KA1 Series Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/kohjinsha/ka1-series/ka1-series_instruction-manual_1986856009.webp)
- 8 -
6.
Connecting Junction Cable(KA1-206)
■
6-1:Connecting AEU and Junction Box with Junction Cable
* See Figure 2 (Figure2 doesn
’
t show details.)
*AEU and Controller are connected by way of Junction Box(Junction Board). Before
connecting AEU with Controller, you need to connect AEU with Junction Box.
Please follow the above procedure, which should avoid damaging controller or AEU
in case of something wrong happened. Again controller isn
’
t connected at this
moment.
*NOTE
・Please find our a sufficiently large room to place all the AEUs and Controller
before connecting Junction Cable.
・50M BAND will be used for element extend and retract test.
Ref (Reflector) will extend to about 1.5m (5 feet) on one side. Because
elements are quit flexible, you don
’
t have to have element full extension wide
area. However, if the place is too narrow, elements may get crooked.
・Don
’
t step on elements. If it gets folds, the antenna may not work with full
performance.
・For this test you don
’
t have to install AEUs on the boom. Put them on the floor
or a large table.
・Please watch elements carefully in order for them not to get damages or dirty.
*See Figure2 showing how to connect AEU・Junction Box・Junction Cable・
Controller Cable・Controller.
Follow the COLOR LABEL stick on each cable to find which AEU to connect with.
Description about wirings in Junction Box is written in [6-2].
[See Figure2]