![Kobold SWK 1101 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/kobold/swk-1101/swk-1101_operating-instructions-manual_1982512006.webp)
SWK
page 6
SWK K06/0618
7. Mechanical
Connection
Before installation:
Make sure that the permitted maximum operating pressure and the operating
temperature of the device are not exceeded.
Make sure that the electrical supply for the devices corresponds with the
operational data of the device.
Make sure that no remains of packing material exist within the device.
The devices should not be installed within an inductive field.
If possible, it should be checked, after the mechanical installation whether the
connection joints/ piping is properly sealed.
Attention! A displacement of switching range occurs if the flow takes
place from top to bottom.
8. Electrical
Connection
Attention! Make sure that the voltage values of your system
correspond with the voltage values of the measuring unit, mentioned
on type-label.
Make sure that the supply wires are de-energized.
The connection of the bistable reed contact succeeds is accomplished through
the cable on the contact housing. The potential-free contact closes on rising
level above the adjusted flow value.