Kobold PSE series Скачать руководство пользователя страница 9

 

 

PSR/PSE 

PSR/PSE K23/0322 

 

page 9 

equipment  in  question,  which  is  issued  by  a  body  designated  for  explosion 
protection. 
a) The voltage of the supply units must be less than or equal to the voltage Ui 

of the flow monitor. 

b) The total current Io of the supply devices must be less than or equal to the 

current Ii of the flow monitor. 

c) The ignition limit curves from EN 60079-11 must be taken into account in 

Zone 2 without a safety factor and must be observed during installation. In 
Zone  1,  the  safety  factor  1.5  must  be  used.  A  control  drawing  (system 
description)  to  be  created  by  the  installer  /  operator  is  required  for  the 
installation of the intrinsically safe circuit. 

d) Equipotential  bonding  must  be  established  along  the  intrinsically  safe 

circuit if the power is supplied via an earthed source. 

q) The  certificates  must  be  taken  into  account,  including  the  special  conditions 

stipulated therein. 

r)  Within  the  potentially  explosive  area,  assembly  may  only  be  carried  out  in 

accordance  with  the  locally  applicable  installation  regulations.  The  following 
conditions must be observed (incomplete): 

a) Installation and maintenance may only be carried out in an explosion-free 

atmosphere  and  in  compliance  with  the  regulations  applicable  in  the 
country of the operator. 

b) Additional precautions must be taken if the presence of hydrogen sulfide, 

ethylene  oxide  and  /  or  carbon  monoxide  is  to  be  expected:  These 
substances have a very low ignition energy! 

c) If these substances are present and if a substance of explosion group IIC 

is present and an explosive atmosphere is likely to be present, only non-
sparking tools may be used! 
 

d) The  flow  monitors  must  not  be  used  in  systems  with  cathodic  corrosion 

protection; in borderline cases, consult the manufacturer. 

a) Particular  care  must  be  taken  to  ensure  that  no  stray  currents  (e.g. 

generated  by  motors  that  are  operated  on  frequency  converters, 
welding  systems  and  /  or  cathodic  corrosion  protection  systems)  are 
passed through the flow monitor. 

 

6.4.  Maintenance, servicing 

Definition of terms according to IEC 60079-17: 
 

Maintenance  and  repair:

  A  combination  of  all  activities  that  are  carried  out  to 

keep  an  object  in  a  condition  or  to  bring  it  back  into  a  condition  that  meets  the 
requirements  of  the  relevant  specification  and  ensures  the  execution  of  the 
required functions. 
 

Inspection:

 An activity that involves the careful examination of an object with the 

aim  of  making  a  reliable  statement  about  the  condition  of  this  object,  without 
dismantling or, if necessary, with partial dismantling, supplemented by measures 
such as B. measurements is carried out. 
 

Содержание PSE series

Страница 1: ...Operating Instructions for Paddle Flow Monitor Model PSR PSE...

Страница 2: ...7 Identification of the flow monitor nameplate 11 7 Mechanical Connection 12 8 Electrical Connection 13 9 Limit Switches 13 10 Maintenance 15 11 Technical Information 16 11 1 General 16 12 Order Code...

Страница 3: ...info de kobold com in PDF format specifying the relevant invoice number and serial number If you wish the operating instructions can also be sent to you by post in paper form against an applicable pos...

Страница 4: ...odel PSR PSE 4 Regulation Use Series PSR and PSE are used to monitor liquid flow Instruments are provided with an adjustable limit switch Only low viscosity fluids that are compatible with the materia...

Страница 5: ...orm in the original operating instructions Textual changes are permitted the ex relevant statements remain To ensure functionality and for your own safety please read the enclosed operating instructio...

Страница 6: ...ed Permitted use The intrinsically safe flow monitor can be used as follows taking the certified parameters into account In Zone 0 Gas Ex Cat 1G in explosion groups IIA IIB and IIC In Zone 20 Dust Ex...

Страница 7: ...ures 6 2 4 2 General safety information The flow monitor corresponds to the state of the art and is operationally safe The flow monitor can pose a residual risk if it is used and operated improperly b...

Страница 8: ...itions specified in the operating instructions must be strictly adhered to and appropriately protected against adverse ambient conditions e The mechanical flow monitor may only be operated when it is...

Страница 9: ...ce with the regulations applicable in the country of the operator b Additional precautions must be taken if the presence of hydrogen sulfide ethylene oxide and or carbon monoxide is to be expected The...

Страница 10: ...may be used in potentially explosive areas that meet all the requirements of the European directives and national legislation c Maintenance measures with dismantling of the flow monitor may only be c...

Страница 11: ...ng and used parts must be disposed of in accordance with the regulations of the country in which the product is installed 6 7 Identification of the flow monitor nameplate 6 7 1 Marking for the standar...

Страница 12: ...fitting must match the flow direction For dirty media it is recommended that the upper housing will be installed as close to vertical as possible respectively with not more than 40 deviation from vert...

Страница 13: ...ally the PSR PSE can be ordered with an SPDT switch Contact mode Depending on the positioning of the adjustable standard switch the following contact modes are available Normally open The contact clos...

Страница 14: ...chieved Normally closed contact The switch range is adjustable in the area of the white arrow By sliding the switch unit in the direction of flow the minimum switch value given in the table is achieve...

Страница 15: ...be checked and cleaned regularly Cleaning of the instrument The device requires regular maintenance and cleaning The intervals are determined by the operator according to the environmental stresses on...

Страница 16: ...30 VAC DC max 40 W 40 VA U Changeover contact Standard max 0 5 A max 150 VAC DC max 20 W 20 VA C N O N C contact 2 A 20 VAC 0 18 A 230 VAC max 40 W D Changeover contact 0 13 A 150 VAC 0 5 A 40 VAC max...

Страница 17: ...tainless steel 1 4301 stainless steel 1 4301 Leaf spring stainless steel 1 4310 stainless steel 1 4310 Balance arm stainless steel 1 4310 stainless steel 1 4310 Sleeve brass 58 stainless steel 1 4301...

Страница 18: ...1 2 N40 1 1 2 NPT Special switching ranges1 Nominal size Qmax L min water Model Connection Contact Cable version Rising flow rate L min water Falling flow rate L min water Material brass Material stai...

Страница 19: ...only for horizontal installation 2 only for N O contact R and C 3 Length as described 4 only for N O contact R 5 cable material and length please specify in clear text Order Details ATEX and IECEx Ver...

Страница 20: ...0 1 PSR 2220 1 R25 G 1 N25 1 NPT 17 7 26 8 12 8 24 7 DN 25 130 PSR 2125 7 PSR 2225 7 26 0 36 3 21 4 34 1 DN 25 130 PSR 2125 5 PSR 2225 5 29 8 42 8 24 7 40 9 DN 25 130 PSR 2125 4 PSR 2225 4 47 6 67 2 4...

Страница 21: ...Changeover contact 3 1 FPM O Rings 3 2 NBR O Rings 14 Dimensions Model PSE xx49 PSE xx52 PSE xx14 Model PSR Model D1 L2 mm PSE 498R R 1 2 51 PSE 520R R 1 2 72 PSE 149R R 1 2 130 PSE 498N 1 2 NPT 59 P...

Страница 22: ...ection through housing IP code EN IEC 63000 2018 Technical documentation for the assessment of electrical and electronic products with respect to the restriction of hazardous substances Also the follo...

Страница 23: ...ctive systems intended for use in a potentially Explosive Atmospheres Quality Management Production Certificate number BVS 21 ATEX ZQS E110 Notified body DEKRA Testing and Certification GmbH Identific...

Страница 24: ...PSR PSE page 24 PSR PSE K23 0322 16 EU Declaration of Conformance ATEX...

Страница 25: ...PSR PSE PSR PSE K23 0322 page 25...

Страница 26: ...PSR PSE page 26 PSR PSE K23 0322 17 ATEX Certificate...

Страница 27: ...PSR PSE PSR PSE K23 0322 page 27...

Страница 28: ...PSR PSE page 28 PSR PSE K23 0322...

Страница 29: ...PSR PSE PSR PSE K23 0322 page 29...

Страница 30: ...PSR PSE page 30 PSR PSE K23 0322...

Страница 31: ...PSR PSE PSR PSE K23 0322 page 31 18 IECEx Certificate...

Страница 32: ...PSR PSE page 32 PSR PSE K23 0322...

Страница 33: ...PSR PSE PSR PSE K23 0322 page 33...

Страница 34: ...PSR PSE page 34 PSR PSE K23 0322...

Страница 35: ...PSR PSE PSR PSE K23 0322 page 35...

Отзывы: