
NBK-04
NBK-04 K01/0922
page 7
7. Mechanical Connection
Remove the cotter pin from bottom end of the dip
pipe, next, remove the transport lock of the float.
Fix the float with the magnet system towards top
and make sure, there are no remains of packing
material or other impurities inside the tube.
Set the cotter pin back and widen it. Secure the
measurement system by means of a connecting
flange on your container/drum/vessel.
Should the NBK be subjected to constant shock or
strong vibrations, it is recommended that the
instrument will be secured with damping-rubber
tube clips. In any case, the over-head tube should
never be welded onto the tank.
Final
Measurement
M
e
as
uring length
Measuring length
Initial
Measurement
Initial
Measurement
Final
Measurement
Connection flange
Roller indication