Kobold KAL-K Скачать руководство пользователя страница 5

  

KAL-K 

KAL-K K03/0516 

 

Page 5 

6. Mechanical 

Connection 

Prior to installation 

  Ensure that the actual system flow rate is within the switching range of the 

KAL-K. 

  Ensure that the maximum system temperature and pressure are within the 

limits specified per section. (see section 12. Technical Information)  

 

Fitting 

Mount the sensor into the piping and make sure that it is completely filled with 
fluid. The probe tip has to reach at least 5 mm (better > 5 mm) into the pipe (see 
below). 
 

 
Fitting position 

The sensor can be mounted in any orientation 
as long as the piping is completely filled with 
fluid. The mounting position has to be smooth 
and free of turbulence. 
(Recommended input and output length: 5 x 
pipe diameter, of straight - run piping both 
upstream and downstream of the flow switch). 
In case of sediments in the pipe the shown 
mounting position is recommended. 
 
 
 

7.  Electrical Connection and Operational Elements 

 

Attention ! Ensure that the power is disconnected during the 
connection of the cable.  
Ensure that the voltage of your installation corresponds to the 
voltage values given on the device's specification plate. 
 

 

 

24 V

DC

-Version (terminal connector) 

  Remove electronic cover 

  (The fixing screws are secured against falling out) 

  Strip 3-wire cable (approx. 40-60 mm), strip single 

wires (approx. 4-6 mm) and pull through cable 
gland. 

Sediments

Содержание KAL-K

Страница 1: ...Operating Instruction for Electronic Flow Monitor Compact Version Model KAL K...

Страница 2: ...8 Characteristics 7 9 Output Characteristic only for 24 VDC 8 10 Commissioning 9 11 Maintenance 10 12 Technical Information 11 13 KAL K Diagnostics 12 14 Order Codes 12 15 Spare parts 12 16 Dimension...

Страница 3: ...uld damage to a device be visible we recommend a thorough inspection of the delivery packaging In case of damage please inform your parcel service forwarding agent immediately since they are responsib...

Страница 4: ...ss the pipe cross section and approaches zero at the pipe wall This means that in practice the depth of installation of the probe the internal pipe diameter and the flow profile of the liquid in the p...

Страница 5: ...letely filled with fluid The mounting position has to be smooth and free of turbulence Recommended input and output length 5 x pipe diameter of straight run piping both upstream and downstream of the...

Страница 6: ...ly voltage of 24 VDC 10 see 12 Technical Information Check function of electronic set point LED must flash Calibrate flow switch see 10 Commissioning 110 VDC 110 VAC or 230 VAC version Remove electron...

Страница 7: ...tion mode If a calibration is done the bi coloured LED flashes green see also section 10 Commissioning If any signal error occurs the bi coloured LED flashes red SET pushbutton 3 The calibration switc...

Страница 8: ...tput is GND GROUND 0 VDC Output function N O function In the N O function the output switches into the low resistance state PNP NPN DUO LED Actual value set point green Actual value set point red Brea...

Страница 9: ...ays no flow The LED strip is not illuminated only the threshold value LED is flashing The Flow Monitor is ready for operation b Calibration of the trend indicator span The KAL K is factory checked and...

Страница 10: ...t point Alarm status Bi coloured LED red Actual value 0 no flow present slowly flashing switching point LED set point Actual value set point Alarm status LED Bi coloured LED red Actual value Actual va...

Страница 11: ...optical indication on LED chain with flashing LED Output indicator LED red alarm green flow OK Switching output 24 VDC version semiconductor PNP NPN switchable max 400 mA short circuit proof 110 VDC...

Страница 12: ...KAL K1415 KAL K6415 G 3 4 KAL K1320 KAL K6320 KAL K1420 KAL K6420 M 12x1 KAL K0312 1 4 NPT KAL K5308 KAL K8308 KAL K5408 KAL K8408 1 2 NPT KAL K5315 KAL K8315 KAL K5415 KAL K8415 3 4 NPT KAL K5320 KAL...

Страница 13: ...AL K 24VAC DC L D B L D O O O K B B K O D L O O D L K B O KAL K KAL A K A 1 4301 1 4305 1 4571 G 1 2 X X X 1 2 NPT X X G 1 4 X X G 3 4 X M 12x1 X X 1 4 NPT X X 3 4 NPT X X A C mm E mm F mm G mm G 26 7...

Страница 14: ...KAL K Page 14 KAL K K03 0516 KAL 4440 with Tri clamp...

Страница 15: ...patibility EMC Part 6 4 Generic standards Emission standard for industrial environments EN 61000 6 2 2005 Electromagnetic compatibility EMC Part 6 2 Generic standards Immunity for industrial environme...

Отзывы: