
- 15 -
PC 70i, 100i Operating Manual
5.0 POWER SUPPLY CONTROLS INDICATORS AND REATURES
Figure 6 PC series front panel
1. Main
Power
Switch
2. Pilot
Arc
Switch
3. Gas
Check
Switch
4. 2T/ 4T Switch
5. Fuse
6. Machine On Indicator
7. Temperature
Indicator
8. Cutting Operation Indicator
9. Air
Pressure
Indicator
10. Cutting Current Control
11. Digital Meter