
7
Telescopic Stack Installation
Note: Duct cover with telescopic stack sold separately.
1.
Mark centerlines of cook top or range on ceiling above. Use centerlines marked on ceiling
to position the mounting template as shown in Figure 2.
2.
Remove and save template. Cut and remove ceiling drywall. Install 2” x 4” cross framing
lumber (not provided) between ceiling joists. Refer to Figure 3. Consult a professional if
you have difficulty or your installation is unique.
3.
Finish the ceiling surface. Be sure to mark the location of the ceiling joists and cross
framing, or replace the mounting template in the position of the ceiling joists & cross
framing.
4.
Attach the telescopic stack to the ceiling and securely fasten to the joists and cross framing
with eight screws (not provided) as shown in Figure 3. Make sure screws are driven into
center of joists and cross framing for maximum support.
5.
Adjust the telescopic stack using reference
F
calculated in Table 1 and measurements on
page 12. Tighten from the side with eight (4x8 mm) screws (provided) as shown in Figure
4.
Figure 2
Figure 3
Figure 4
www.goedekers.com
Содержание IS2336SQ
Страница 2: ...1 ENGLISH 1 FRENCH 24 SPANISH 48 www goedekers com ...
Страница 20: ...18 MODEL NO IS2336SQ IS2342SQ www goedekers com ...
Страница 21: ...19 CIRCUIT DIAGRAM MODEL NO IS2336SQ IS2342SQ www goedekers com ...
Страница 26: ...24 Français www goedekers com ...
Страница 44: ...42 No DE MODÈLE IS2336SQ IS2342SQ www goedekers com ...
Страница 45: ...43 SCHÉMA DE CÂBLAGE No DE MODÈLE IS2336SQ IS2342SQ www goedekers com ...
Страница 50: ...48 ESPAÑOL www goedekers com ...
Страница 68: ...66 MODELO NO IS2336SQ IS2342SQ www goedekers com ...