![Knightsbridge TRKAD1 Series Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/knightsbridge/trkad1-series/trkad1-series_installation-and-maintenance-manual_1980497005.webp)
• Remove the 2 screws from the Live and Neutral terminals, and ensuring correct polarity
is observed, terminate Live (brown) Neutral (blue) to the screw terminals (see Fig. 5)
• Refit the terminal cover and fasten down the 2 screws
• Ensuring track polarity is observed, lock the fitting into the track
• Switch on and check for correct operation
•
Place heat shrink onto the Live and Neutral wires and crimp the ring terminals securely onto the wires
(see Fig 3)
Fig 3
•
Once the crimp terminals have be secured to the 2 wires, pull the heat shrink over the crimped area and
shrink with a heat gun (see Fig 4)
Fig 4
•
Remove the 2 screws from the Live and Neutral terminals and ensuring that correct polarity is observed
terminate Live (brown) Neutral (blue) to the screw terminals (see Fig 5)
Shrink with heat gun
Fig 5
Neutral (blue)
Live (brown)
Fig. 5