
Stepping motor diaphragm metering pump FEM 1.02 / FEM 1.09
Installation and connection
KNF Flodos AG BA_FEM1-02_1-09_EN_07_157639.docx
Translation of Original Operating and Installation Instructions
12
Fig. 6: Mounting dimensions UFEM 1.09, UFEM 1.09 .27
Make sure that the installation location is dry and the pump is protected
against water in the form of rain, spray, splashes and drips.
Protect the pump against dust.
Protect the pump against vibration and impact.
Generally speaking, the pump can be mounted in any installation position.
For maximum precision and rapid venting the vertical pumping direction
should ideally run from bottom to top (fig. 7).
Installation location
Installation position
Fig. 7: Optimum installation
position from bottom to top