background image

Installation Instructions

Adjustable Glass Shelf Kit

0132-524-GL2

Tools Required (not included):

- Power Drill
- 1/16" Drill Bit or 3/16" Drill Bit
- Level
- Tape Measure
- #2 Phillips Bit
- Phillips Screwdriver
- Pencil

Installation Materials (included):

- (2) Shelves
- (4) Decorative Finial
- (4) Shelf Clamp
- (2) 18" Wall Standard
- Mounting Hardware

Load Rating:

-  50 lbs when mounted into studs

Figure 1

Figure 2

 

Installation:

Step 1:

 Select a location to install the shelf kit. Mark the location of the top screw hole of 

the left standard with a pencil.
  

NOTE:

 For proper installation the slots located on the standards must always be facing 

the left. Both standards are identical.

Step 2:

 Mark the location of the top screw hole of the right standard 16" to the right of the 

first mark. Use a level to ensure the standards will be the same height 

Figure 1

.

  

NOTE:

 If the standards are not being installed directly into a stud, pre-drill an anchor 

hole using a 3/16" drill bit in the locations marked above. Then insert the anchors  
and continue. 

  

NOTE:

 If the standards are being installed directly into a stud, pre-drill a screw hole 

using a 1/16" drill bit in the locations marked above and continue.

Step 3:

 Check to ensure the slots on the standards are facing towards the left, then fasten 

the top screw through each standard using the screws provided.

Step 4:

 Use a level to ensure that the standards are straight up and down. Then use a 

pencil to mark the location of the bottom screw hole on each standard, making sure 
marks are 16" apart.

Step 5:

 Carefully move the bottom of the standards to the side and pre-drill the  

appropriate holes 

Figure 2

.

  

NOTE:

 If the standards are not being installed directly into a stud, pre-drill an anchor 

hole using a 3/16" drill bit in the locations marked above. Then insert the anchors  
and continue.

  

NOTE:

 If the standards are being installed directly into a stud, pre-drill a screw hole 

using a 1/16" drill bit in the locations marked above and continue.

Step 6:

 Carefully move the standards back to the straight up and down position. Then 

fasten the standards to the wall using the screws provided.

Slots to  

the left

Top  

screw hole

16"

Level

Slots to  

the left

Slots to  

the left

Slots to  

the left

Pre-Drill Hole

Level

Содержание Shelf Made 0132-524-GL2

Страница 1: ...e NOTE If the standards are being installed directly into a stud pre drill a screw hole using a 1 16 drill bit in the locations marked above and continue Step 3 Check to ensure the slots on the standards are facing towards the left then fasten the top screw through each standard using the screws provided Step 4 Use a level to ensure that the standards are straight up and down Then use a pencil to ...

Страница 2: ...serting them into the slots located on the left side of the standards at the desired heights Figure 4 Tap shelf clamp down to lock in place NOTE Each shelf clamp must be level with the shelf clamp directly across from it on the other standard Step 9 Attach the shelves by placing them into the shelf clamp Once in the correct position use a screwdriver to tighten the clamps Figure 5 Figure 4 Figure ...

Страница 3: ...es puis continuez l installation REMARQUE Si les montants sont fixés directement à un montant du mur pré percez un trou à l aide d une mèche de 1 16 po aux emplacements marqués ci dessus puis continuez l installation Étape 3 Vérifiez que les fentes des montants sont orientées vers la gauche puis installez chaque montant par son trou supérieur au moyen des vis fournies Étape 4 Utilisez un niveau po...

Страница 4: ... les insérant à la hauteur désirée dans les fentes situées du côté gauche des montants tel qu illustré à la Figure 4 Tapez sur les pinces pour les verrouiller en place REMARQUE Chaque pince pour tablette doit être de niveau avec celle située directement en face sur l autre montant Étape 9 Mettez les tablettes en place en les posant sur les pinces pour tablettes Lorsqu elles sont dans la position d...

Страница 5: ...mente sobre un montante perfore previamente un orificio de tornillo con una broca de de 1 5 mm 1 16 en las ubicaciones marcadas anteriormente y continúe Paso 3 Verifique para asegurarse de que las ranuras de los rieles estén mirando a la izquierda luego ajuste el tornillo superior en cada riel utilizando los tornillos provistos Paso 4 Utilice un nivelador para asegurarse de que los rieles estén de...

Страница 6: ...s ranuras ubicadas en el lado izquierdo de los rieles a la altura deseada Figura 4 Golpee la abrazadera del estante hacia abajo para posicionarla en el lugar NOTA Cada abrazadera del estante debe estar nivelada con la abrazadera del otro riel directamente en frente a esta Paso 9 Adjunte los estantes al ubicarlos en la abrazadera del estante Una vez que se encuentren en la posición correcta utilice...

Отзывы: