24
START-UP
Before initial operation of this piece of equipment, review the “
Pre-Operational Checklist
” at
the front of this manual. Make sure all fields of the checklist have been checked and performed and
make any notes necessary for future operators. Your piece of equipment should now be ready for field
operation.
NOTES:
Содержание 64 Series
Страница 1: ...THIS MANUAL TO ACCOMPANY MACHINE PART NO 64 OM 02 PRINTING DATE DEC 2015 OPERATOR S MANUAL 64 SERIES ...
Страница 5: ...3 MODELS COVERED IN THIS OWNER S MANUAL 6410 Litter Windrower with Gauge Wheels ...
Страница 14: ...12 OVERHEAD LAYOUTS ...
Страница 31: ...29 AUGER BEARINGS SHEAR UNIVERSAL GREASE GREASE DRIVE SHAFT BEARING GREASE GREASE ...
Страница 32: ...30 GREASE EACH TIRE PIVOT GAUGE WHEELS GREASE EACH TIRE HUB ...
Страница 34: ...32 ...