
User's manual
K&F SEQUENZA 5 incl. accessories
KLING & FREITAG GMBH © 2015
Version 4.1
Page 31 of 88
You can set the position of the load adapters in 1/2-steps because they are usable on both
sides. In doing so, the number of drill holes in the flying frame and, thus, the adjustment
possibilities, is doubled. The load adapters are labelled with '1/1 Grid' on the one side and
'1/2 Grid' on the other. The simulation software CON:S gives you the information
whether a load adapter should be mounted in the 1/1 or the 1/2 position. In the 1/1 position
(A), the arrow on the 1/1 side of the load adapter must point toward the front side of the
flying frame (Front). In the 1/2 position (B), the arrow on the 1/2 side of the load adapter
must point toward the front side of the flying frame (Front).
A = Load adapter 1/1 grid position
B = Load adapter 1/2 grid position
Tip
Tip for unused equipment
There is a parking position provided for every piece of equipment, such as a connector or a
ball lock pin. Always leave the equipment in the provided park position or fasten unneeded
equipment back into the provided park position. This ensures that all pieces are always
available.
Instructions about using the load adapter or the TV spigot
Always use the simulation software CON:S to calculate the correct position of
load adapters or TV spigots. In this calculated position, the array is guaranteed to fly at the
desired angle later, and the sound will be emitted correctly.
Содержание SEQUENZA 5
Страница 2: ......