
Klimawent
– the warranty of highest quality at attractive price
6 z 12
Reel Exhaust Extractor
ALAN-U/E-HD-N
24.05.2019
Having installed the extractor under the ceiling or at the
wall, connect the reel outlet (in application without the
built-on fan) with the round section ventilation conduit,
to discharge the exhaust volume out of the process
room.
In application where the extractor is equipped with the
built-on fan
– FA, connect the fan outlet with a short
section of a flexible conduit with the ventilation ducting.
Depending on the diameter of the fan outlet, the
ventilation conduit should have diameter
Ø160 or Ø200
mm.
To prepare the Reel Exhaust Extractor for operational
use, connect the fan motor and the ZE-ALAN-U/E to the
power supply system, according to the enclosed
Connection Diagram.
Important is the connection of the protective cable
to the PE terminal in the control box
. Install the
control unit near the exhaust extractor as possible
– in a
place as convenient for the operator.
Fig. No.4
– Mounting positions of the reel extractor
at the operational place
Having completed all the connections and after the fan start,
it is important to check the impeller rotation
sense of the fan impeller
– this concerns the three-phase motor only
.
The impeller rotation sense ought
to be according to the arrow on the fan housing
.
Fig. No.5
– Connection Diagram – Control unit and 230V supply