background image

                                   12 

                                    

explosion-proof extraction arms

  ERGO

-

L/Z-

{

2

;

3

;

4

}

/Ex                  

 

       

10.01.2019

 

   

 

 

13.  Sample of the Declaration of Conformity 

 

 

 

Declaration of conformity EC No. …………….. 

 

Manufacturer (eventually the authorized representative / importer): 
name:  

KLIMAWENT  S.A.

 

address:  

81-

571 Gdynia,  Chwaszczyńska 194

  

 

A person, authorized for issuing the technical documentation:  

Teodor Świrbutowicz,  KLIMAWENT S.A. 

 

hereby declares that the appliance: 
name:   

Explosion-proof extraction arms

 

 

type/model: 

ERGO-L/Z-[2,3,4]/Ex, ERGO-L/Z-[2;3;4;]-R/Ex

 

serial number:  ……………………………..  year of production:  ……………………….. 

 

meets the requirements of the subsequent European Directives:

 

 

2006/42/EC

 

Machinery Directive 

of the European Parliament and of the Council of May 17

th

, 2006  on machinery 

– amen- 

ding the 95/16/EC (recast) /

Journal of Laws EC L157 of 09.06.2006, page 24

 

2014/34/EC ATEX Directive 

of the European Parliament and of the Council of February 26

th

, 2014 on the harmonisation of  

the laws of Member States relating to equipment and protective systems intended for use in potentially explosive atmosphe- 
res. / 

Journal of Laws EC L96  of 29.03.2014

 / 

 

The appliance meets following harmonized standard: 

● 

EN ISO-12100:2012 

 
 

 

“Safety of 

machinery

  

– 

Basic concepts, general

 principles  

 

 

 

for design.  Risk assessment and risk reduction” 

● 

EN 1127-1:2011

 

 
 

 

Explosive

 atmospheres.

 

Explosion

 prevention 

and protec

 

 

 

tion.  Basic 

terminology and methodology” 

● 

EN ISO 80079-36:2016-07

 

 
 

 

“Explosive atmospheres

  

– Part 36:

  

Non-electrical equip- 

 

 

 

ment for

 

explosive

 atmospheres.

   

Methodology

 and requi-  

rements 

● 

EN ISO 80079-37:2016-07

 

 
 

 

“Explosive atmospheres

  

  

Part 37:

  

Non

-electrical equip- 

 

 

 

ment 

for 

explosive

 atmospheres.

  

 

Non-electrical types of 

protection.

  

Constructional safety 

c

 

● 

E-05204;  1994 

 
 

 

“Protection against the static electricity. Requirements” 

● 

E-05205;  1997 

 
 

 

“Protection against the static electricity in manufacturing 

 

 

 

and in applications  with explosives  

–  Requirements” 

 

Marking of the appliance: 

 

II 2 G c

 

 

…………………………… 

…………………………… 

…………………………… 

place, date 

signature of authorised person 

name, surname, function 

 

 

of the signatory 

KLIMAWENT  S.A. 

District Court Gdańsk-Północ 

NIP:  958 159 21 35 

Supported Employment Enterprise 

in Gdańsk,  VII Wydział Gospodarczy 

REGON:  220631262 

81-571 Gdynia, 

ul. Chwaszczyńska 194

 

of the National Register of Court 

Bank Account:  

Santander Bank Polska S.A. 

phone: +49 58 829 64 80 

KRS 0000308902  company stock 

56 1500 1025 1210  2007 8845 0000 

email:  

[email protected]

  13.779.200 zł paid in total 

 

www.klimawent.com.pl

   

 

 

 

Содержание 814R21

Страница 1: ...3 5 Structure and Function 5 6 Assembly and Start up 6 7 Operational Use 7 8 Troubleshooting Guide 7 9 Maintenance 7 10 Occupational Health and Safety 8 11 Transport and Storage 8 12 Terms of warrant...

Страница 2: ...O 80079 36 2016 07 Explosive atmospheres Part 36 Non electrical equip ment for explosive atmospheres Methodology and requi rements EN ISO 80079 37 2016 07 Explosive atmospheres Part 37 Non electrical...

Страница 3: ...of any additional elements not belonging to the normal device structure or acces sory set is not acceptable C Do not undertake any structural changes or constructional modifications on the device on o...

Страница 4: ...0 800 2280 ERGO L Z 2 R Ex 2110 1487 122 2213 ERGO L Z 3 Ex 2195 2888 922 3100 ERGO L Z 3 R Ex 2835 2092 409 3033 ERGO L Z 4 Ex 2732 3372 1266 3710 ERGO L Z 4 R Ex 3374 2561 573 3643 No Type Dimension...

Страница 5: ...ction arm and discharging the electrostatic loads to the grounding dissipation A full rotation swivel of stainless steel spark proof execution provides 360 rotation of the extraction arm around its ve...

Страница 6: ...WENT S A additionally provides installing the ex traction fans Wall brackets can be mounted on the wall or on another construc tion through stainless steel bolts M10 CAUTION Installing of the ERGO L Z...

Страница 7: ...always in the same ERGO Ex extraction arm to set the rotation axis vertically position 3 Drop in the air suction rate Improper impeller rotation sense of the extraction fan along with the increased C...

Страница 8: ...ompleted the work leave the extraction arm in the ultimate operational position in case when it constitutes obstacle to personnel set in into home position 11 Transport and Storage Extraction arms hav...

Страница 9: ...9 10 01 2019 explosion proof extraction arms ERGO L Z 2 3 4 Ex...

Страница 10: ...10 explosion proof extraction arms ERGO L Z 2 3 4 Ex 10 01 2019...

Страница 11: ...11 10 01 2019 explosion proof extraction arms ERGO L Z 2 3 4 Ex Grounding cables of the extraction arms ERGO L Z 2 3 4 Ex oraz ERGO L Z 2 3 4 R Ex 1 2 3 4 5 6...

Страница 12: ...armonized standard EN ISO 12100 2012 Safety of machinery Basic concepts general principles for design Risk assessment and risk reduction EN 1127 1 2011 Explosive atmospheres Explosion prevention and p...

Отзывы: