![Klimaire KIWQ Series Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/klimaire/kiwq-series/kiwq-series_user-and-installation-manual_1977777030.webp)
INSTALLATION MANUAL - Outdoor Unit installation
30
Proper torque chart
Coupling dimension
Pound-force(1bf-ft)
Newton meter(N-m)
Kg-force meter(kgf-m)
(
6.35)9.5mm dash size
(
9.52)12.7mm dash size
(
12.7)19mm dash size
(
16)25.4mm dash size
11.8
11.8
13.3
14.8
16
16
18
20
1.7
1.7
1.9
2.1
Note: Leakage check. After completing the installation, check all the connecting are sealed
correctly using leak detection spray or soap suds. If any bubbles form, the system has a leak
and the screw connerctors must be re-tightened usingan open-ended spanner.
3. Remove the cover of outdoor valves both 2-way vale (liquid valve) and 3-way vale (suction valve), use
the inner-hexagon (allen wrench) spanner to open the outdoor valve core, by turning it counter-clockwise.
If the valve core is not opened fully, the system may malfunction or suffer damage.
Then re-screw the valve cover back.
4. Connecting the wire by plugging the quick
connecting cable for both indoor and outdoor.
NOTE ABOUT WIRING
THE WIRING CONNECTION PROCESS MAY
DIFFER SLIGHTLY AMONG UNITS
Connector
Power
supply
Y/G
L
N
1
3
2
Fig.26.1
Fig.26.2
Fig.26.3
Содержание KIWQ Series
Страница 38: ...GENERAL NOTES 38...
Страница 39: ...GENERAL NOTES 39...