MultiBase U20 EB | Code number 588.51.740-003 | Version 0
4
.2019
Page 7 of 9
Electrical installation
Installation diagram
Electrical data (to be performed by the customer)
0,00
7.2
9
13
1
2
3
4
12
11
8
7.1
10
6 5
14
120 [3‘-11‘
‘]
Main fuse:
3 x fuse 25 A (slow)
or circuit breaker 3 x 25 A
(trigger characteristic K or C)
Supply line 5 x 4 mm
(3 PH + N + PE) with marked
wire and protective conductor
2
No. Qunatity
Description
Position
Frequency
to main switch
3
1 per
230/400 V
unit
Supply line 4 x AWG 10
(3 PH + PE) with marked wire
and protective conductor
to main switch 1 per
120/208 V
unit
1
in the supply
line
Electricity meter
1
1
in the supply
line
2
1 per
230/400 V
unit
3 x fuse 35 A (slow)
or circuit breaker 3 x 35 A
(trigger characteristic K or C)
in the supply
line
1 per
120/208 V
unit
1
Foundation earth connector
corner pit
floor
5
every
10 m
Empty pipe DN 40
with taut wire
7.1
1 per
system
1
Separate supply line (230 V)
with lighting and power outlet
from supply
line into the
shaft
4
1 per
system
Separate supply line (120 V)
with lighting and power outlet
from supply
line into the
shaft
1 per
system
1
Equipotential bonding in accordance
with DIN EN 60204 from foundation
earth connector to the system
6
1 per
system
1
base pit to
operating
device
Empty pipe DN 40
with taut wire
supply line to
hydraulic unit
7.2
1 per
system
1
Stand for operating device
8
1 per
system
1
Electrical data (included in delivery of KLAUS Multiparking)
Control box with lockable main switch
Control line 3 x 0.75 mm
2
(PH + N + PE)
Control line 7 x 1 mm
2
with marked wire and protective conductor
Operating device
Control line 4 x 2.5 mm
2
with marked wire and protective conductor
Hydraulic unit 7.5 kW with three-phase current, 230/400 V - 50 Hz
Hydraulic unit 7.5 kW with three-phase current, 120/208 V - 60 Hz
9
10
11
12
13
14
No.
Description
Technical data
Low-noise power units mounted to rubber-bonded-to metal
mountings are installed. Nevertheless we recommend that
parking system’s garage be built separately from the dwelling.
Units
– maintenance offer/contract
– declaration of conformity
Available documents
By default, the system can only be used for a fixed number of
users. If required, would you please contact us.
Field of application
If the permissible drop opening is exceeded, safety grids are to be
mounted on the systems. If there are traffic routes next to or
behind the installations, barriers compliant to DIN EN ISO 13857
must be installed by the customer. Barriers must also be in place
during construction.
Safety grids
Environmental conditions for the area of multiparking systems:
Temperature range –20 to +40° C [–4 to +104° F].
Relative humidity 50% at a maximum outside temperature
of +40° C [+104° F].
If lifting or lowering times are specified, they refer to an
environmental temperature of +10° C [+50° F] and with the
system set up directly next to the hydraulic unit. At lower
temperatures or with longer hydraulic lines, these times
increase.
Environmental conditions
See separate sheet regarding corrosion protection.
Corrosion protection
To avoid damages resulting from corrosion, make sure to follow
our cleaning and care instructions and to provide good ventilation
of your garage.
Care
The systems offered correspond to DIN EN 14010 and the
EC Machinery Directive 2006/42/EG.
CE Certification
According to LBO and GaVo (garage regulations) the Multiparking
systems are subject to approval. For the building application please
submit this data sheet.
Building application documents
Page 1
Section
Dimensions
Car data
Page 2
Width
dimensions
Page 3
Width
dimensions
Page 4
Function
Approach
Load per
parking sp.
Page 5
Load plan
Page 6
Pit edge
Page 7
Electrical
installation
Technical
data
Page 8
Tec. data
To be perfor-
med by the
customer
Page 9
Description