9
EN
Insert the drain valve into the corresponding hole. Tighten it with a nut (M12). This is
located on the fermenting kettle on the arched part. Insert the lever into the valve inlet.
The orientation of the arm can be adjusted by turning the drain valve during the
fermentation process. If the yeast sediment is above the valve level, you can tap the
clear beer out of the fermenter as you rotate the arm so that it reaches above the yeast
tube).
ASSEMBLY
Please insert the thermometer into the thermometer bore and tighten it with a nut screw
(M10). This is located in front of the boiler, as shown. First, insert the sealing ring into the
temperature sensor.
Only for 10033675
Assembly of 3 removable stands with 4 screws (M6) and 4 nuts per stand (M6).
Mount the dump valve (1/2'') to the L-shaped pipe at the bottom of the fermenter. Use
thread sealing tape (not included) to prevent leaks.