37
EN
•
Liquid gas cylinder systems should only be installed, commissioned, modified and
checked by specialized companies.
•
Liquid gas cylinder systems should only be installed in the commercial sector by
trained personnel and checked by an appropriately qualified person or, when
dealing with certain cylinder systems, by a person assigned by the contractor
(accident prevention regulation BGV D34).
•
The cylinder must be set in an upright position (cylinder positioned on their side
pose a threat of deflagration.)
•
The operating instructions provided by the manufacturer of the liquid gas appliance
are to be observed carefully by the user for operation and, if necessary, for
troubleshooting measures.
•
Prior to the initinal operation, or after making a modification, the operator of
a liquid gas cylinder system must be assured of its orderly condition through
examination and certification by a specialized company (commercial systems are
to be addressed by a specialized person responsible for the respectvie commercial
sector). The certificates from the examinations are to be kept by the operator.
•
If the system is not going to be used for a prolonged period the valves are to be
closed; when doing this start from the device shut-off valve towards the cylinder
valve. When starting up the system again the valves are to be opened; when doing
this start from the cylinder valve towards the device shut-off valve .
•
Naked flames and smoking are prohibited in areas where large cylinders are stored
and in close proximity to large cylinder systems.
•
The ventilation openings of the installation area and/or the cylinder cabinet must be
kept free.
• Warning signs must be applied
•
The operator is prohibited from shipping liquid gas!
Changing the cylinder
•
When changing the cylinder only loose the regulator connection after the cylinder
valve has been fully closed (clockwise).
•
The pressure regulator must be connected and well sealed. Pay attention to the
existing sealing ring (see diagram) Note left-hand thread!
•
Every time the cylinder is changed the seal of the regulator connection must be
tested using foaming agents (e.g. soapy water).
•
For multi-cylinder systems: Close the shut-off valve of the container connecting line;
set switch to full cylinders.
Содержание 10033589
Страница 2: ......
Страница 12: ...12 DE Höhe 2 Montage der Standbeine mit Verbindungsstück Schritt 1 Schritt 2 Schritt 3 Schritt 4 ...
Страница 31: ...31 EN Height 2 Install the two section leg Step 1 Step 2 Step 3 Step 4 ...
Страница 42: ......
Страница 43: ......
Страница 44: ......