
22
EN
•
Lift the cooker hood, lock the plate covers with 8 ST4*8 screws to the hanging
plates.
Installation (Chimney kit)
1 Firstly, remove the outlet cover from
the cooker hood.
2 Position the hanging plate on the
ceiling and then mark the position of
the screw holes.
Securely fix the hanging plate to the
ceiling.
3
For wooden ceiling:
11 ST4 (30 mm) screws
For cement ceiling:
8 expansion bolts