
Installing Instruction
Installing Instruction
Installing Instruction
Installing Instruction
Healthcare chiller of the KSC Series
Healthcare chiller of the KSC Series
Healthcare chiller of the KSC Series
Healthcare chiller of the KSC Series
Version „Revision 0
Version „Revision 0
Version „Revision 0
Version „Revision 05
5
5
5”
”
”
”
Type KSC 215
Type KSC 215
Type KSC 215
Type KSC 215----L
LL
L----U/S
U/S
U/S
U/S
page
page
page
page 25
25
25
25von
von
von
von39
39
39
39
U:\KSC 215 L\03_Dokumente\Installationsanleitung\KKT_chillers_Installing_Instruction_engl_Vers05.doc
1.
From the lowest point possible, fill the pipe with water/ethylene glycol mixture until
no more air escapes from the vent (at the highest point).
Fill the centrifugal pump with the water/ethylene glycol mixture and vent. Close the
vent.
2. Continue filling until the pressure on the water circulation manometers display 1.5
bar (21.75 PSI) with the pump OFF
OFF
OFF
OFF.
3. Turn on the pump for 15 seconds and turn it off again.
4. Open the vents on the air chambers and the pump and vent off the remaining air.
The pressure on the manometers drops.
5. Fill again until the pressure on the manometers with the pump OFF
OFF
OFF
OFF reaches 1.5 bar
(21.75 PSI).
6. Repeat starting with step 3 until no more air escapes from the vents and the static
pressure with the pump off does not drop below 1.5 bar (21.75 PSI).
7. Clean the filter during the next-to-the-last pass.
8.
If the pressure remains constant for 60 – 90 minutes of operation, the coolant
circulation system is full and no air remains.
Figure
Figure
Figure
Figure 1
1
1
1