
Date :
…….………………………………
Installer :
……………………………………
3-2 FIRST IGNITION OPERATION
15. Check the ignition
current
Complete……………………
……
.
12. Check the working in
DHW mode
Complete……………………
…….
9. Set the heating power.
See section
Complete……………………
…….
6. Fill the installation. See
section
Complete…………………….
3. Check the gas tightness
Complete……………………
…
2. Check the type of gas and
change the gas if necessary
Complete……………………
5. Check the exhaust
fume. See section……
Complete……………………
8. Spin the pump.
Complete……………………
…….
11. Balance the central
heating circuit
Complete ……………….……
…
14. Make a combustion rate
with once pressing on
RESET button during 5 sec
Complete ……………….……
1. Check the electrical supply.
Complete……………………
…….
4. Measure the gas inlet
Complete……………………
…….
7. Check the hydraulic
tightness
Complete……………………
…….
10. Adapt the regulation at
the heating instation
Complete……………………
…….
13. Adjust DHW flow rate on
the boiler (if necessary)
Complete……………………
…….
16. Explain to the end user
the working of the boiler
Complete……………………
…….
23페이지
Содержание eco condensing - 16D
Страница 6: ...2 Installation 2 1 Appliance dimension and required specification 6페이지 ...
Страница 27: ...4 Direction for assembly 4 1 Part exploded view 27페이지 ...
Страница 43: ...10 Memo 43페이지 ...
Страница 44: ...11 Warranty 44페이지 ...