25
RUNWAY BEAM
BRIDGE BEAM
TEMP SUPPORT
Figure 3-2
3.1.3
Install the remaining frames on the crane bridge and install the end brackets on both ends of the
end trucks (See Figure 3-3). Install pinion shafts, pinions, and collars (See Figure 3-3). Geared
and motorized only.
Runway Beam
End Truck Frames A & B
Bridge Beam
Pillow Blocks
Pinions & Collars
Figure 5 & 6
End Bracket
Figure 3-3
3.1.4
With the temporary support method of 3.1.2 above still in place refer to Figure 3-4 and check the
following:
a) End truck frames parallel; (A = B).
b) Bridge beam centered on each end truck.
c) Squareness of end trucks to the bridge beam; (X = Y).
3.1.5
Make adjustments as necessary. Then securely tighten and double nut each fastened
connection of the end truck frames to bridge beam. Refer to tightening torque values of
Table 3-1.
Table 3-1 Tightening Torque
Bolt Size
M12
M14
M16
M20
Tightening Torque kg-cm
(ft-lbs)
1150
(83)
2580
(187)
5070
(366)
Содержание HARRINGTON 3 Series
Страница 23: ...23 This Page Intentionally Left Blank ...
Страница 51: ...51 This Page Intentionally Left Blank ...
Страница 54: ...Figure 10 1 Underhung Push End Truck Parts View Section 10 Replacement Parts 10 1 Underhung End Trucks 54 ...
Страница 56: ...Figure 10 2 Underhung Motorized End Truck Parts View Section 10 Replacement Parts 10 1 Underhung End Trucks 56 ...
Страница 67: ...This Page Intentionally Left Blank 67 ...
Страница 71: ...This Page Intentionally Left Blank 71 ...
Страница 77: ...This Page Intentionally Left Blank 77 ...
Страница 78: ...Figure 10 9 End Truck Gear Head Assembly Parts View 78 Section 10 Replacement Parts 10 5 Gear Head Assembly ...