59
APPENDIX 6 – INSPECTION PROCEDURE
Every time one visits the weather station and the
LAS
(preferably at a 2 week interval) it is
recommended to follow the inspection procedure given here:
1. Check the power supply of the weather station (Solar panel and battery)
Check if the green LED labelled “RUN” of the COMBILOG data logger is activated. If so the
display of the COMBILOG should show the actual date and time and the real time
measurements of all sensors.
In case the COMBILOG is NOT responding check the power supply. First, check the LED
information of the solar controller (see error messages (left LED 1, Table 7) and state of
charge battery (right LED 2, Table 8)).
Table 7: Status and color left LED 1 of Solar Controller (error messages).
LED 1
Status
Load
Action
Green
flashing
All OK
-
No reset
Red-green
flashing
Load current is too high
Disconnected
Switch of or disconnected users,
remove error, reconnect users
Red-yellow
flashing
Module current is too
high
Disconnected
Automatically, when over current does
no longer exist
Constant red
Controller is over heated
(> 85
o
C)
Disconnected
Automatically, when temperature has
decreased
Yellow
flashing
Battery voltage is too
high (> 15 VDC)
Disconnected Automatically, when voltage has fallen
Red
flashing Battery voltage is too
low (< 10.5 VDC)
Disconnected Automatically, when voltage is
increased again
Table 8: Status and color of right LED 2 of Solar Controller (SOC).
LED 2
Level
State Of Charge
battery (SOC)
Comments
Green
1
100 % (battery full) -
2 90
%
-
3 80%
-
4 70
%
-
5 60
%
-
Yellow 6
50
%
-
7
40 %
Pre-Warning: load is about to be disconnected (LED 2 is
fast flashing)
8
30 %
Load is disconnected (SOC < 30 %)
Load will be connected again when SOC = 50%)
9 20%
-
Red
10
0% (battery empty) -
In case the solar controller is operational, the battery is in good condition (SOC > 50 %) and
the load is connected, but the data logger and sensors are not functioning check the fuse
located at the overvoltage protection unit (see Figure 38, location 1).
When the solar controller is not operational (all LED’s are switched off) check the fuses
located in front of the solar controller and the fuse located at the plus pole of the battery (see
Figure 38, location 2 and 3).
Содержание LAS
Страница 1: ...Instruction Manual Large Aperture Scintillometer LAS...
Страница 28: ...27 Figure 17 Operational weather station of LAS RET system...
Страница 29: ...28...
Страница 39: ...38...
Страница 45: ...44...
Страница 49: ...48...
Страница 51: ...50 Figure 33 Configuration screen and default settings of supplied RF modems...
Страница 55: ...54...
Страница 69: ...68...
Страница 71: ...70 APPENDIX 9 CONNECTION PLAN LAS BET LAS RET Figure 47 Connection plan LAS BET system...