background image

3

INSTALLATION INSTRUCTIONS

3.1 First please fasten the pipe and this product with the bolts.
      Then fix the film into the pipe by the film hoop, please keep 
      the pipe and the output shaft of this product on the same line;
      then start the motor and operate the opening and closing the
      films.
3.2 Two types of pipe could be used for this motor, the diameter 

      is φ27, φ33.5. When the φ27 pipe is used, the suit is needed,
      the φ33.5 pipe doesn’t need it. 
3.3 The pipe for top opening is φ27.      

4

Manual operation area

Manual operation illustration

When there is power failure, please take off the cap for the
manual operation, use an electrical drill to operate on the releas
-ing shaft, after the operation, please put the cap on.

7

Model 

GMD120-S 

Power 

120W  

Torque 

120N·m 

Current 

8A 

Voltage 

 

DC24V±3V 

Speed 

60N·m 

3.0 r/min 

120N·m 

2.4 r/min 

Rolling tube 

3/4

″(

OD:

Φ

27

or 1

″(

OD:

Φ

33.5

 

Recommended 

Load 

1

Rolling tube 

100m(L)x1.5m(H) 

75m(L)×4m(H) 

Maximum range 

(output shaft) 

38 Rounds 

Protection degree 

IP55 

 

Содержание GMD120-S

Страница 1: ...house Technology Co Ltd Certificate of Quality DATE CHECKED BY QUALIFIED FOR SHIPMENT Design and R D Manufacturing and Production Sales and Service GMD120 S Electric Film Reeler Manual Manufacturer Beijing Fenglong Greenhouse Technology Co Ltd Address No 12 South Street Zhongguancun Haidian District Beijing 100081 China Zip 100081 Tel 86 10 62149667 Fax 86 10 82108614 Website www bflc com cn E mai...

Страница 2: ...e products are qualified with possibility to track down CERTIFICATE OF PRODUCT QUALITY Dear Customer Fenglong has obtained ISO 9001 certificates with inspection all the specifications of KINGZO meet the requirements of product s standard Fenglong solemnly promises to guarantee 3 years for GMD 120 S installed and used in correct way Free maintenance or replacement will be given if quality problem h...

Страница 3: ...Manual is also subject to modification without further notice Please read this Manual carefully before using the product 24V120W GMD120 S Installation Distance Control Mode 30m 50m 75m 100m 150m Each circuit controls 1 set 2 1mm 2 1 5mm 2 2 5mm 2 4mm 2 6mm Each circuit controls 2 sets 2 2 5mm 2 2 5mm 2 4mm 2 6mm 2 10mm Each circuit controls 3 sets 2 4mm 2 4mm 2 6mm 2 10mm 2 10mm Each circuit contr...

Страница 4: ... you should stop operating and contact the distributors or the company 1 8 Please don t put the product into water and store it in moist environment the product could be damaged or cause danger to operators If the products have water leaking inside please stop operating and send it back to the factory for repair 1 9 Please don t toss or throw the products it should be prevented from outside force ...

Страница 5: ...ameter of the pipe used Plugs 2 4 2 4 When the electric film reeler is rolling up the plastics the pipe arrives at the required position at this time rotate the knob which controls the rolling status and make the gear pin touch the micro switch with click sound hold on and fasten the lock bolt by a cross head screw driver 4 2 5 When the electric film reeleris rolling down the plastics the pipe arr...

Страница 6: ...s knob is used for the rolling you need if the electric film reeler doesn t stop running then the other knob is used to control the required rolling 4 LIMIT RANGE ADJUSTING 4 1 Limit illustration Before limit adjust please loosen left or right fasten bolts After limit adjust please fasteb left or right fasten bolts CAUTION After the limit adjust is finished please fasten the bolts Or the limit wil...

Страница 7: ...ed the suit is needed the φ33 5 pipe doesn t need it 3 3 The pipe for top opening is φ27 4 Manual operation area Manual operation illustration When there is power failure please take off the cap for the manual operation use an electrical drill to operate on the releas ing shaft after the operation please put the cap on 7 Model GMD120 S Power 120W Torque 120N m Current 8A Voltage DC24V 3V Speed 60N...

Страница 8: ... the limit switch at any position of the rolling 3 4 4 After the installation the cable should be connect into the control box then turn on the power adjust the limit switch the proper position and then fasten the lock bolts 3 4 5 If there is power failure during the operation of the products and you would like to lower down the rolling pipe urgently you could hold the pipe first and loosen the co...

Отзывы: