Main
tenanc
e T
able
The ins
taller perf
orming the inspection should c
omple
te the f
ollo
wing
char
t, the shaded bo
xe
s mus
t be filled if needed t
opping up the s
ys
tem:
Dat
e o
f inspection
Exp
ansion v
es
sel
se
tting be
for
e filling
Sy
st
em pr
es
sur
e
Exp
ansion v
es
sel
se
tting aft
er filling
Flo
w r
at
e
An
tifr
ee
ze le
vel
pH r
eading
Inspection o
f b
arium
ge
tt
er - v
ac
uum
tube
s only
Engineer de
tails
Prin
t name
Sign Telephone No
.
Upon
Commis
sioning
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
Year 8
Year 9
Year 10
Year 11
Year 12
Year 13
Year 14
Year 15
Year 16
Year 17
Year 18
Year 19
Year 2
0
Year 21
Year 2
2
Year 2
3
Year 2
4
Year 2
5
Содержание FPW18
Страница 1: ...SolarThermalEnergy T 44 0 28 3836 4520 www kingspanthermomax com FPW FLAT PLATE INSTALLATION MANUAL...
Страница 17: ...15 In roof Mounting 19 1 6 20 6 1 6 1 6 1 6 1 21 Bend the flaps on the left sidepart as shown in pict 20 21...
Страница 21: ...19 In roof Mounting 33 8 8 32 8 Fix the bent flaps with 2 rivets 31 8 8...
Страница 33: ...31 Flat Plate Connection Kit KFP0067 1 ISO228Rp 3 4 to G 3 4 2 3 4 washers 3 Stop end...
Страница 46: ......
Страница 47: ......