GL0016P-02 Installation Guidelines for BioDisc
®
Units BF, BG, NF & NG
7
5.10 BG and NG BioDisc have an off-set centre of gravity and should not be lifted by the base channels as
this would risk tipping over the unit. The old slinging points are still in the bottom of the mould, they are
not to be used under any circumstances. Lift using the 4 new metal lifting brackets as indicated by
labels on the unit.
Power Supply
from house
240V 1ph (3ph optional)
(RCD protected - Customer supply)
Steel Wire Armoured
Cable supply
to control panel -
Customer Supply
Inlet Pipe
Control Panel
G.L.
60
0m
m
In
le
t I
n
ve
rt
A
dd 1
0
0
m
m
F
o
r
Ou
tl
e
t In
v
e
rt
Concrete backfill minimum
150mm thick
but to suit specific
site conditions.
Concrete, Pea Shingle or
other suitable free flowing
material followed by
topsoil or finish to
suit site requirements
2
420
m
m
BG/ NG Length 5235mm (Width 2450)
BF/ NF Length 4345mm (Width 2450)
Internal Volumes of Units as an
aid to Calculate Materials
Approximate Weights (Empty):
Base to Working Water Level
(Outlet Invert)
Base to Ground Level
1
2
BF 12.7m BG 14.92m
3
3
Not less
than 65mm
Inlet
182
0m
m
405mm
BF/ NF 1350 Kgs
BG/ NG 1700 Kgs
Backfill void (BG & NG only)
with concrete
BF 16.3m BG 19.4m
3 3
Sling points BF/ NF BG/ NG
Drive Motor
Sling points BF/NF