GL0016P-02 Installation Guidelines for BioDisc
®
Units BF, BG, NF & NG
10
Страница 1: ...ith in the control panel housing If additional copies are required contact Kingspan 510030P BF 3 Phase Control Panel Wiring Diagram 510003P BF 3 Phase Alarm Control Panel Wiring Diagram 510017P BF Sin...
Страница 2: ...tails on request Should you wish to inspect the operation of the equipment please observe all necessary precautions including those listed below which apply to maintenance procedures BioDisc units con...
Страница 3: ...GL0016P 02 Installation Guidelines for BioDisc Units BF BG NF NG 3...
Страница 4: ...also inside units particularly if they have been stored on site prior to installation adding weight and increasing instability Check units before lifting and pump out any excess water 2 5 When lifting...
Страница 5: ...though not obligatory for an installation of this type RCD protection is suggested as an extra precaution 3 12 Pump stations or any other associated equipment should have a separate power supply 3 13...
Страница 6: ...support the installed load but not so much as to prevent subsequent backfill bonding fully to the base 5 4 Ensure that the slab is free of any stones or other material which could damage the unit Low...
Страница 7: ...panel Customer Supply Inlet Pipe Control Panel G L 600mm Inlet Invert Add 100mm For Outlet Invert Concrete backfill minimum 150mm thick but to suit specific site conditions Concrete Pea Shingle or oth...
Страница 8: ...control panel should be positioned adjacent to the unit so that a It does not interfere with cover removal b It is convenient for the incoming power supply c It cannot be reached by someone standing i...
Страница 9: ...han 100 metres from the BioDisc and that the interconnecting cable customer supply should be laid in a separate trench to prevent electrical interference 6 2 5 Connect the incoming power supply to the...
Страница 10: ...GL0016P 02 Installation Guidelines for BioDisc Units BF BG NF NG 10...