background image

17

Using Flex Bends

4. Avoid cutting joists by offsetting the flex pipe. See Fig. 2.

5. When using 45˚ bends a bend support is required directly above the highest

bend.

6. When installing a bend in a joist area a minimum of 4” clearance to com-

bustible to the top of bend must be maintained, sides and bottom of pipe, a
1” clearance to combustibles must be maintained.  If running horizontal
through an area a 1

1

/

2

” minimum clearance to the top of the horizontal pipe

must be maintained.

7. Maximum vertical height of system should not exceed 30 feet.

8. Use roof support and 7” rigid pipe at roof level. Flex not permitted with in

roof support.

9. When penetrating the roof a rigid 7” galvanized pipe must be used. Attach

the 7” flex to the 7” rigid with high temperature sealant and use 4 screws
assuring the flex and rigid pipe are secured.  4” flex pipe must be secured
the same way with 4 screws but must penetrate the 4” flex and 4” section of
termination.  Attach 7” rigid to 7” termination with sealant and screw with 4
sheet metal screws.  (See Fig. 3).

10. Vertical termination clearance is 18” (inches) above the roof, measured

from highest point of exit on the roof line.

11. Support vertical pipes to maintain minimum of one inch or greater

clearances to combustibles.

Roof Flashing

Ensure that you have the proper roof flashing by checking your roof
pitch using a level and two rulers, or by using a roof pitch card.
See figure below.

Slide a Roof Flashing suitable to your roof slope over the vent. Place
the edge of the flashing plate that will be on the higher part of the roof
slope under the shingles. Both the sides and the lower edge lay on top
of the shingles.

NOTE: At the top edge of the flashing plate, lift the shingles and
nail the plate to the roof deck, then cement the shingles to the plate
with a suitable waterproof mastic.

Ensure that the chimney is plumb. Square up the flashing plate and nail
in place to the roof deck. Use 12 nails with neoprene washers or cover
the heads with a suitable waterproof mastic.

Wrap the storm collar around the vent above the flashing. Secure the
ends together loosely with nut and bolt supplied. Slide the collar down
the vent until it comes in contact with the flashing. Tighten the bolt and
seal the Storm Collar to the vent with a suitable waterproof non-com-
bustible mastic.

The flashing and storm collar should be painted to match the roof
shingles. This will extend its life and improve the appearance. Clean,
prime and paint with suitable painting products.

FIG. 1

FIG. 2

Venting Straight Up Through Roof

1. An Attic Insulation Shield must be installed where the vent passes from a

lower living space into an attic space where the chimney is not enclosed. It
is designed to keep insulation materials away from the chimney. See Fig. 1.

2. When installing the Attic Insulation Shield where the chimney passes from

a living space to an attic space, install the shield from below and nail in
place using 1” spiral nails.

3. A fire stop must be installed on the bottom side of the joists when passing

through a ceiling or floor. If an attic insulation shield is to be used, a fire
stop is not required.

1

1

/

2

” Top of Horizontal Vent

2

1

/

2

” Minimum Top of 90° Elbow

All other existing pipes 1” clearances to combustibles.
Support Straps required to maintain rise in venting.

30’

FIG. 3

Содержание ZDV3620

Страница 1: ...e vapors and liquids in the vicinity of this or any other appliance What To Do If You Smell Gas Do not try to light any appliance Extinguish any open flame Do not touch any electrical switch Do not us...

Страница 2: ...tory However due to the high temperature sili cone components the paint will cure when heat is applied to the appliance as it is first used The following information applies to the curing process to g...

Страница 3: ...ly 11 Fan kit installation 12 Millivolt system lighting burner control 13 Vent termination 14 Venting graph 15 General vent installation information 16 Installation of side wall venting 16 Venting ver...

Страница 4: ...is of the home with 8 ga copper wire using a serrated or star washer to penetrate paint or protective coating to insure grounding Use carriage bolt at the attachment point see diagram above to secure...

Страница 5: ...n under water Immediately call a qualified service technician to inspect the heater and to replace any part of the control system and any gas control which has been under water 12 WARNING Do not opera...

Страница 6: ...terminal must be used and if applicable a Product approved air intake must be used Installation shall be in strict compliance with the manufacturer s instructions A copy of the installation instructi...

Страница 7: ...nt system does not exceed 20 feet 6 1m When you install your fireplace as in position B D or E a minimum of 6 inches 153mm clearance must be maintained from the perpendicular wall and the front of the...

Страница 8: ...appliance on the bottom sides and top of fireplace 4 When installing horizontal with a 90 degree bend maintain a minimum of four 21 2 inches above the bend in enclosures 5 Hearth is not mandatory but...

Страница 9: ...tel such paint or lacquer must be heat resistant 250 F to prevent discoloration Warning Combustible objects must not be placed on a non combustible mantel unless the non combustible mantel meets the m...

Страница 10: ...solution 8 The appliance and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1 2 PSIG 3 5...

Страница 11: ...of log must be shifted to the left against tab for proper log placement 4 Front log should be placed in front of burner up against log grate 5 Place right and left logs across front and back log in t...

Страница 12: ...eed switch from the wall mount Turn the variable speed wall controller to its minimum setting fully clockwise Use the set screw on the side of the variable speed controller to increase or decrease the...

Страница 13: ...pilot screw to provide proper sized flame Recommended Maximum Lead Length Double Wire When Using Wall Switch or Thermostat Wire Size Max Length 14 GA 100 FT 16 GA 64 FT 18 GA 40 FT 20 GA 25 FT 22 GA 1...

Страница 14: ...al codes V NOTE Clearances are to the edge of terminal plate add 6 3 4 to clearances to arrive at center line NOTE Local Codes or Regulations may require different clearances Termination It is imperat...

Страница 15: ...f bends required 2 Having determined the vertical distance determine the maximum horizontal section allowed 3 Vent table has been established for 90 horizontal vertical runs With use of flex pipe dist...

Страница 16: ...xpanded to twice their lengths e g 4ft to 8ft Fully expand pipe and cut off excess Do not use more than 2 couplers to extend short pipes Single sections are preferred in an installation attaching at t...

Страница 17: ...of the roof slope under the shingles Both the sides and the lower edge lay on top of the shingles NOTE At the top edge of the flashing plate lift the shingles and nail the plate to the roof deck then...

Страница 18: ...ilder Antique Brass Z36GBC Grill Kit Classic Builder Chrome Z36GBP Grill Kit Classic Builder Polish Brass Z1GBL Grill Kit Black Z1GAB Grill Kit Antique Brass Z1GPB Grill Kit Polish Brass Z36GCR Grill...

Страница 19: ...DVSS Siding Shield ZDV48GP Galvanized Pipe 7 Dia x 48 Vertical Installations ZDVAAF Flashing 7 c w Storm Collar 1 12 to 7 12 ZDVAF2 Flashing 7 c w Storm Collar 8 12 to 12 12 ZDVAF3 Flashing 7 c w Stor...

Страница 20: ...minals at wall switch If burner comes on replace defective Switch ON wall switch If okay jumper wires across wall switch wires at valve If burner comes on wires are faulty or connections are bad Gener...

Страница 21: ...service or maintenance h damage repairs inoperation or inefficiency resulting from faulty installation or application i electricity or fuel costs or any increase in electricity or fuel cost whatsoeve...

Отзывы: