background image

19

EN

08. 

Replace the cover and tighten the two screws 

Fig. 19

;

Fig. 19

09.

 Finally, secure the gear motor by turning the release key;

10.

  For  the  assembly  of  the  second  motor,  carry  out  the  same 

operations proceeding in reverse order for the adjustment of the limit 
switches;

11.

  After  installing  and  adjusting  the  motors,  position  the  leaves 

halfway  along  their  stroke  so  that,  after  making  the  electrical 
connections,  they  can  learn  the  opening  and  closing  procedures 
correctly 

Fig. 20

.

Fig.20

Содержание Modus 280

Страница 1: ...cting device a sign with the inscription WARNING MAINTENANCE IN PROGRESS During installation handle the automatism with care avoiding crushes shocks falls or contact with liquids of any kind Do not pl...

Страница 2: ...suitable for the product IMPORTANT The gear motor cannot automate a manual gate that does not have an efficient and safe mechanical structure It cannot correct defects due to bad installation or poor...

Страница 3: ...2 shows an example of an automation system using King Gates components These components are positioned following a typical and standard setup With reference to Fig 2 establish the approximate position...

Страница 4: ...the desired opening angle suitable for the column Trace a vertical line starting from the point identified and obtain value A Before proceeding with the installation make sure that value A allows to f...

Страница 5: ...9 Fig 9 Secure the gear motor to the front bracket 01 Secure the gear motor arm to the bracket as shown in Fig 10 using the pin and seger supplied Fig 10 02 Tighten the seger fully onto the pin seat 3...

Страница 6: ...in the presence of mechanical stops on the ground Fig 15 05 At this point re install the arm onto the motor Fig 16 Fig 16 06 Manually verify that when opening and closing the gate leaf stops at the de...

Страница 7: ...ssembly of the second motor carry out the same operations proceeding in reverse order for the adjustment of the limit switches 11 After installing and adjusting the motors position the leaves halfway...

Страница 8: ...gear motor and insert the connection cables Fig 22 A B Fig 22 03 Bring the cables to the top of the motor near the control unit Fig 23 Fig 23 04 For how to connect the two motors refer to the manual...

Страница 9: ...tment is entrusted to the control unit Commissioning Commissioning can only take place after all the testing phases of the gear motor and the other devices have been successfully completed For commiss...

Страница 10: ...y influenced by the severity index of the manoeuvres performed by the automatism that is the sum of all the factors contributing to the wear of the product see Table 1 To establish the probable durabi...

Страница 11: ...L of 17 May 2006 on machinery and amending Directive 95 16 EC recast It is hereby declared that the relevant technical documentation has been compiled in accordance with Annex VII B of Directive 2006...

Страница 12: ......

Отзывы: