background image

17

EN

3.5.2

 – Securing the gear motor to the 

fixing brackets

• Secure the gear motor to the rear bracket:
01.

 Secure the gear motor to the bracket as shown in 

Fig. 7

 using 

the screws, washers and nuts supplied;

Fig. 7

02.

 Fully tighten the nuts to the screws.

• Install the arms onto the motor:
01.

 Secure the arm onto the gear motor using the screw;

Fig. 8

02.

 Fix the two arms to each other using the pin and the seger 

Fig. 9

Fig. 9

• Secure the gear motor to the front bracket:
01.

 Secure the gear motor arm to the bracket as shown in 

Fig. 10

 

using the pin and seger supplied;

Fig. 10

02.

 Tighten the seger fully onto the pin seat;

3.5.3

 – Installation of the front fixing 

bracket

01.

 The front bracket must be secured to gate leaf;

02.

 Define the front bracket position height in accordance with 

Fig. 4

03.

Fix the bracket to the solid section of the gate leaf 

Fig.11

.

Fig. 11

3.5.4

 – Installation and adjustment of 

the motor limit switches

Adjust the gear motor 

opening

 and 

closing

 limit switches:

01.

 Release the gear motor as shown in 

Fig. 12

;

Fig. 12

Содержание Modus 280

Страница 1: ...cting device a sign with the inscription WARNING MAINTENANCE IN PROGRESS During installation handle the automatism with care avoiding crushes shocks falls or contact with liquids of any kind Do not pl...

Страница 2: ...suitable for the product IMPORTANT The gear motor cannot automate a manual gate that does not have an efficient and safe mechanical structure It cannot correct defects due to bad installation or poor...

Страница 3: ...2 shows an example of an automation system using King Gates components These components are positioned following a typical and standard setup With reference to Fig 2 establish the approximate position...

Страница 4: ...the desired opening angle suitable for the column Trace a vertical line starting from the point identified and obtain value A Before proceeding with the installation make sure that value A allows to f...

Страница 5: ...9 Fig 9 Secure the gear motor to the front bracket 01 Secure the gear motor arm to the bracket as shown in Fig 10 using the pin and seger supplied Fig 10 02 Tighten the seger fully onto the pin seat 3...

Страница 6: ...in the presence of mechanical stops on the ground Fig 15 05 At this point re install the arm onto the motor Fig 16 Fig 16 06 Manually verify that when opening and closing the gate leaf stops at the de...

Страница 7: ...ssembly of the second motor carry out the same operations proceeding in reverse order for the adjustment of the limit switches 11 After installing and adjusting the motors position the leaves halfway...

Страница 8: ...gear motor and insert the connection cables Fig 22 A B Fig 22 03 Bring the cables to the top of the motor near the control unit Fig 23 Fig 23 04 For how to connect the two motors refer to the manual...

Страница 9: ...tment is entrusted to the control unit Commissioning Commissioning can only take place after all the testing phases of the gear motor and the other devices have been successfully completed For commiss...

Страница 10: ...y influenced by the severity index of the manoeuvres performed by the automatism that is the sum of all the factors contributing to the wear of the product see Table 1 To establish the probable durabi...

Страница 11: ...L of 17 May 2006 on machinery and amending Directive 95 16 EC recast It is hereby declared that the relevant technical documentation has been compiled in accordance with Annex VII B of Directive 2006...

Страница 12: ......

Отзывы: