Page 5
1. Remove and save the dome cover screws.
(Fig. 5)
.
2. Carefully remove the dome cover. Do not allow dome cover to catch on internal
components or wiring.
DO NOT SET THE DOME COVER UPSIDE DOWN.
3. Remove and discard the shipping bolt.
Fig. 5
REMOVE SHIPPING RESTRAINTS
IMPORTANT!
The shipping bolt must be
removed prior to installation.
IMPORTANT!
CAREFULLY remove the
dome cover. Do not allow
dome cover to catch on
internal components or
wiring.
EXTREMELY IMPORTANT!
NEVER lift the unit by the LNB assembly, Wave Guide assembly, or the dish.
Lift the unit by the base ONLY.
Содержание 1200-KU
Страница 2: ......
Страница 13: ...This page intentionally left blank Page 11 ...
Страница 21: ...Page 19 ELEVATION ZONE MAP ...
Страница 27: ...This page intentionally left blank Page 25 ...
Страница 34: ...Page 32 Notes ...
Страница 35: ......