Rev. 11/2010
Page 3
Product No. 14197
Procedure
Assemble Softener
Larger units require tank
connection.
Assemble Mach Head (if applicable)
Lube O-rings
Connect tanks
4
5
a
Position Softener
Position softener and brine
tank on a level surface.
If within 3 meters of hot water
tank, make sure an expansion
tank is used.
Environmental conditions:
50º C Max., protect from
freezing
Water conditions:
Temperature 1 – 50º C
Pressure:
1 – 8.5 Bar
3
5
b
Connect Adapters for
Classic Control Valve Systems
Lube O-rings
Insert adapters
Insert adapter bracket
Insert adapter pin
Connect Adapters for
Mach Control Valve Systems
Install O-rings
Lube O-rings
Insert adapters
Insert E-clips
2
Test Water Quality
Confirm water quality to determine proper setup
Total Hardness
pH
Ferrous Iron
Ferric Iron
Cabinet / Brine Tank
Softener Assembly
Instructions
Parts Pack
Brine Line
Drain Line
1
Unpack Equipment
Locate and identify parts shown in parts section.