Kinder KICC00MN Скачать руководство пользователя страница 25

SECTION 4

MAINTENANCE

Servicing Notes

Servicing should be carried out annually by a competent person such as a CORGI
registered engineer. This is a condition of the Kinder Fires extended 
guarantee schemes.
The service should include visually checking the chimney and fire opening for
accumulations of debris and a smoke test to check for a positive up-draught in the
chimney.
The condition of the coals should be checked and if necessary the whole set
should be replaced with a genuine replacement set.
The burner assembly is designed to be removed as a complete unit for ease of
access.  After any servicing work a gas tightness check must always be 
carried out.

Manual Control Fires  – For Diagrams refer to Section 2

4.1

Removing the burner assembly from the fire.

4.1.1

Prepare work area (lay down dust sheets etc.)

4.1.2

Remove the trim.  Lift the fender and ash pan cover out of the way and 
put them in a  safe location.  Remove the loose coals from the fuel bed 
and front ceramic rail. Remove the front ceramic from the rail. Unscrew 
the two pozi-driv fixing screws which secure the burner heat shield and 
remove it from the fire.

4.1.3

Isolate the gas supply and remove the inlet pipe from the appliance 
inlet elbow.  Unscrew and remove the four screws which retain the 
burner.  Remove the burner assembly from the fire.

4.1.4

To refit the burner assembly.  Push the base of the control panel fully 
into the fire and secure with the four screws.  Refit the gas supply pipe 
and carry out a gas tightness test.  Refit the burner heat shield 

then 

refit the coals referring to section 3 for the correct coal layout.  The 
fender and ash pan cover can now be re-positioned.  Refit the trim.

4.2

Removing the Piezo Igniter

4.2.1

Remove the burner assembly as in section 4.1

4.2.2

Disconnect the ignition lead from the piezo and unscrew the 
retaining nut on the rear of the control panel.  Withdraw the piezo from 
the front of the control panel.  Reassemble in reverse order and carry 
out a gas tightness test.

25

Содержание KICC00MN

Страница 1: ...tions Hand these instructions to the user Model No s KICC00MN KICCZZMN KICC00SN KICCZZSN are only for use on Natural Gas G20 at a supply pressure of 20 mbar in G B I E Model No KICC00MP is only for us...

Страница 2: ...ssure SC models 18 Section 3 Assembling Fuel Bed and Commissioning 3 1 Assembling the ceramics and fuel bed 19 22 3 2 Lighting the appliance Manual Control model 23 3 3 Lighting the appliance Slide Co...

Страница 3: ...box Dimensions with trim fitted Width with standard trim no spacer 470mm Height with standard trim no spacer 586mm Depth overall without fender 250mm Depth Flush fit from mounting face to rear 250mm...

Страница 4: ...t 1 Installation of Chimneys and flues 7 IS 813 1996 Domestic Gas Installation Republic of Ireland No purpose made additional ventilation is normally required for this appliance when installed in G B...

Страница 5: ...150mm 1 5 FLUE CHIMNEY INSPECTION Before commencing installation a flue or chimney should be inspected to ensure that all the following conditions are satisfied 1 Check that the chimney flue only ser...

Страница 6: ...ied out during commissioning of the appliance 1 6 FIRE PLACE OPENING AND CHIMNEY CATCHMENT SPACE The front opening of the fire place must be between 400 and 450 mm wide and between 550 and 570mm high...

Страница 7: ...fig 2 Opening Width mm Minimum Depth Required mm 400 minimum opening width 298 410 392 420 285 430 280 440 273 450 maximum opening width 269 For example if the appliance was to be fitted into a 400mm...

Страница 8: ...opening and have a minimum width of 760mm and a minimum projection of 300mm forwards from the fire opening If the appliance is fitted with a black 50mm spacer frame then the hearth projection must be...

Страница 9: ...2 2 INSTALLING THE FIRE BOX Establish which type of flue you are intending to install the fire in to 225 x 225mm 9 inch x 9 inch brick built chimneys 175mm 7 inch diameter lined brick or stone flue in...

Страница 10: ...age and carefully lift the fire box into the fire opening then slide it back into position Check that the fire box flange fits flush to the sealing face of the fire surround or wall with no gaps prese...

Страница 11: ...ps present f Remove the burner To allow burner removal the control lever operat ing cable must be removed The control lever operating cable can be seen running across the base of the fire below the bu...

Страница 12: ...s at either side of the firebox and the two fixing screws at the base of the fire See fig 6 above Carefully pull the base of the burner forwards and downwards from the fuel bed support panel The burne...

Страница 13: ...to the appliance should be made to the isolating inlet elbow using 8mm rigid tubing There must be no soldered joints within the firebox See fig 8a 8b below for suggested concealed pipe layouts Fig 8a...

Страница 14: ...which in turn will damage the burner and control systems of the product Fig 9 below shows a correctly sealed installation Fig 9 PLEASE NOTE Only holes to be left are the specifically sized air relief...

Страница 15: ...fire opening in the positions shown below in fig 10 Fig 10 Fit the wallplugs provided and screw the fixing eyes securely into the rear of the fire opening If the clearance at the rear of the fire is a...

Страница 16: ...ull the seal up against the sealing face of the wall it does not need to be compressed Check that there are no gaps behind the seal n With the fire securely in place if a concealed gas connection has...

Страница 17: ...2 Screws and secure the trim to the fire using the magnets provided q Before making the final gas connection thoroughly purge the gas supply pipework to remove all foreign matter otherwise serious da...

Страница 18: ...point screw for gas tightness with the appliance turned on using a suitable leak detection fluid or detector 2 4 GAS TIGHTNESS AND INLET PRESSURE SLIDE CONTROL MODELS a Remove the pressure test point...

Страница 19: ...t and is not lodged on the burner See fig 13 below Fig 13 b Position the two halves of the front ceramic L H R H on the locating channel in the front ceramic ensuring it is located onto the lip on the...

Страница 20: ...s s in the front ceramic rail as a guide for placement See fig 15 below Fig 15 d Select four of the large coals and arrange behind the front row of coals ensuring that flame paths as indicated below a...

Страница 21: ...the rear of the fuelbed using the ribs in the rear of the fuelbed as a guide for placement See fig 17 below Fig 17 f Select the four remaining large coals and position to fill the gaps at each end of...

Страница 22: ...nd servicing we recommend that you use a HEPA filtered vacuum to remove any dust accumulated in and around the appliance before and after working on the appliance When replacing these articles we reco...

Страница 23: ...he off position the pilot will now be extinguished 3 3 LIGHTING THE APPLIANCE Slide Control Models a Turn on the isolation valve Depress the control lever fully downwards to the position marked Hold d...

Страница 24: ...occurs or if in doubt repeat the test after a further 5 10 minutes If the test indicates that spillage is occurring and the flue restrictor baffle has been fitted it should be removed and the test rep...

Страница 25: ...them in a safe location Remove the loose coals from the fuel bed and front ceramic rail Remove the front ceramic from the rail Unscrew the two pozi driv fixing screws which secure the burner heat shie...

Страница 26: ...the thermocouple separately because the thermocouple position is factory set to a tight tolerance Any replacement of parts on the pilot requires a complete new pilot assembly 4 4 1 Remove the burner...

Страница 27: ...g the two screws into the side frame of the firebox and two screws into the base It is now necessary to refit and correctly tension the operating cable To do this first set the control lever to the ho...

Страница 28: ...he microswitch 4 8 3 Unscrew and remove the two pozi drive screws which secure the pilot assembly to the burner Remove the pilot 4 8 4 Re assemble in reverse order and carry out a gas tightness test 4...

Страница 29: ...ush in the gap between the two lengths of p t f e sleeve Ensure that the cable is located in the retaining hole in the locking bush and tighten the screw sufficiently to retain the cable but still all...

Страница 30: ...parts are as follows these are available from your local stockist whose details may be found on the BFM Europe website address as per rear page Fuelbed base B 58690 Fuelbed front rails L H R H B 18730...

Страница 31: ...accuracy of illustrations and descriptions contained in this book cannot be guaranteed Part No B 103530 Issue 1 BFM Europe Ltd Trentham Lakes Stoke on Trent Staffordshire ST4 4TJ www bfm europe com Te...

Отзывы: