Kilsen KZ705 Series Скачать руководство пользователя страница 2

2 / 12 

 

P/N 10-4221-501-3KZ5-01 • ISS 23FEB15 

EN: Installation Instructions 

Description 

This manual includes installation and wiring information for the 
following mounting bases: 

 

Base 

Description 

KZ705 

Standard mounting base for conventional and 
addressable fire alarm systems. 

KZ705D 

Standard mounting base with diode for conventional fire 
alarm systems. 

KZ705I 

Standard mounting base with isolator for addressable 
fire alarm systems. 

KZD705 

Deep mounting base for conventional and addressable 
fire alarm systems. 

Wiring 

Caution: 

To ensure correct operation of your system, you 

must follow the recommended cabling practices described 
below. 

The cable used should: 

• 

Have a cross-sectional area of at least 1.5 mm

2

 

• 

Have maximum resistance of 13.3 Ω/km per core 

Direct cable connection 

The KZD705 deep mounting base allows for direct cable 
connection by breaking the cable entry tab (see figure 4). The 
maximum cable width is 10 mm. 

KZ705, KZ705D, and KZ705I mounting bases allow for direct 
cable and tube connection using a S700 adapter (not 
supplied). 

Connection 

Connect the detector base as shown in Figures 1 to 3: 

 

Base 

System 

Figure 

KZ705 / KZD705 

Addressable 

Figure 1 

KZ705 / KZD705 / KZ705D 

Conventional 

Figure 2 

KZ705I 

Addressable 

Figure 3 

 

End-of-line connection: 

• 

KZ705 / KZD705: connect contacts 1 and 3. 

• 

KZ705D: connect contacts 1 and 4. 

All bases except the KZ705D require an earth connection. 

Maintenance and testing 

Basic maintenance consists of a yearly inspection. Do not 
modify the internal wiring or circuitry. 

Test procedure for KZ705, KZD705, and KZ705D bases: 

1.  Remove the detector head from the base.  

2.  If the control panel fails to indicate the test all connections 

should be checked and the unit address verified (where 
applicable). 

Test procedure for KZ705I bases: 

1.  Remove the detector head from the base and verify that 

the correct alarm is produced at the control panel. 

2.  Test the isolator by provoking a short circuit between 

connectors 1 and 6, verifying that the isolator status LED 
indicates this action. Repeat for connectors 1 to 7. 

3.  If the status LED and control panel fail to indicate the test, 

all connections should be checked and the unit address 
verified (where applicable). 

Specifications 

 

 

KZ705 
KZ705D 

KZD705 

KZ705I 

Operating 
voltage 

N/A 

N/A 

17 to 38 VDC 

Current 
consumption (in 
standby) 

N/A 

N/A 

50 µA 

Current 
consumption (in 
short circuit) 

N/A 

N/A 

6 mA 

Isolating 
resistance 

N/A 

N/A 

140 mΩ 

IP rating 

IP30 

IP30 

IP30 

Operating 
temperature 

−10 to +70°C 

−10 to +70°C 

−10 to +70°C 

Storage 
temperature 

−10 to +70ºC 

−10 to +70ºC 

−10 to +70ºC 

Relative humidity 
(noncondensing) 

10 to 95% 

10 to 95% 

10 to 95% 

Dimensions 

Ø 100 x 29 mm  Ø 125 x 40 mm  Ø 100 x 29 mm 

Certification and compliance 

 

Manufacturer 

United Technologies Safety System Co. Ltd. 
80, Changjiang East Road, QETDZ,  
Qinhuangdao, Hebei Province, China 066004 

Authorized EU manufacturing representative:  
UTC Fire & Security B.V.  
Kelvinstraat 7, 6003 DH Weert, Netherlands 

Certification 
KZ705, KZD705, 
KZ705D 

 

 

Contact information 

For contact information, see www.utcfssecurityproducts.eu. 

CS: Návod k instalaci 

Popis 

Tato příručka obsahuje informace o instalaci a zapojení 

následujících montážních základen dodávaných společností : 

 

Содержание KZ705 Series

Страница 1: ...UTC Fire Security All rights reserved 1 12 P N 10 4221 501 3KZ5 01 ISS 23FEB15 KZ705 Series Mounting Base Installation Sheet EN CS ES FR HU IT NL PL PT TR 1 KZ705 KZD705 2 KZ705 KZD705 KZ705D 3 KZ705...

Страница 2: ...nternal wiring or circuitry Test procedure for KZ705 KZD705 and KZ705D bases 1 Remove the detector head from the base 2 If the control panel fails to indicate the test all connections should be checke...

Страница 3: ...by b t zkontrolov na v echna spojen a ov ena adresa jednotky lze li tento postup pou t Postup p i zkou en z kladen KZ705I 1 Sejm te hlavu hl si e ze z kladny a ov te zda st edna aktivovala spr vnou po...

Страница 4: ...I 1 Retire la cabeza del detector de la base y verifique que aparece la aver a correcta en el panel de control 2 Pruebe el aislador provocando un cortocircuito entre los conectores 1 y 6 verificando q...

Страница 5: ...que l adresse de l unit le cas ch ant Proc dure de test pour les bases KZ705I 1 Retirez la t te du d tecteur de la base et v rifiez que la centrale de d tection incendie indique l alarme correspondan...

Страница 6: ...onton 2 Az izol tor ellen rz s hez id zzen el r vidz rlatot az 1 s 6 csatlakoz k k z tt s gy z dj n meg arr l hogy az izol tor llapotjelz LED jelz f nye jelz st ad err l Ism telje meg ugyanezt az 1 s...

Страница 7: ...2 Controllare l intervento dell isolatore provocando un corto circuito tra i connettori 1 e 6 e verificando che l azione sia segnalata dal LED di stato dell isolatore Ripetere la precedente procedura...

Страница 8: ...arm wordt aangegeven 2 Test de isolator Maak kortsluiting tussen aansluitingen 1 en 6 en controleer of dit wordt aangegeven door het statuslampje van de isolator Herhaal deze procedure met aansluiting...

Страница 9: ...dzy stykami 1 i 6 Dioda LED stanu izolatora powinna wskaza zaistnienie zwarcia Powt rz dla styk w 1 i 7 3 Je li dioda LED stanu ani centrala nie poinformuj o zaistnia ej sytuacji nale y sprawdzi wszy...

Страница 10: ...e controlo 2 Teste o isolador provocando um curto circuito entre os conectores 1 e 6 e verificando que o LED de estado do isolador indica esta ac o Repita para os conectores 1 a 7 3 Se o LED de estado...

Страница 11: ...m ba lant lar kontrol edilmeli ve nite adresi do rulanmal d r uygulanabilir yerlerde KZ705I tabanlar i in test prosed r 1 Dedekt r kafas n tabandan kar n ve kontrol paneline alarm n geldi ini do rula...

Страница 12: ...12 12 P N 10 4221 501 3KZ5 01 ISS 23FEB15...

Отзывы: