5. Operating Instructions: 

 

 

 

 

 

 

 

 

5.1 Power ON/OFF: 

5.1.1 Precautions: 

 

Click 

”  button  or  press  the  “INV  ON  /  INV  OFF”  button  on  the  panel  for  the  ON/  OFF 

operation. 

 

 

 

 

 

 

Warning! 

 

The operation steps can make the output terminal of the Energy Sever voltage. 

 

If necessary, please disconnect the connection of the lower load and attach a warning sign at the 

load connection. 

 

The components with its protective cover plate that need to be opened by tools are inoperable 

parts for the user. 

 

Only  the  maintenance  support  personnel  authorized  by  the  company  can  open  the  protective 

cover plate of Energy Server. 

5.1.2 Power ON Steps: 

1. Switch ON the output switch of the battery. 

2. Switch ON the input switch of the external power (RECTIFIER, BYPASS) of the Energy Sever. 

3. Switch ON the DC START switch of the Energy Sever. 

 

Note!  

 

All  buttons  for  the  user  operation  involved  in  the  operation  steps  and  LED 
display are shown in the "Product Profile". 

 

Please read the instructions carefully before conducting any operation, in order 
to avoid the personnel injury or  equipment damage caused by the improper 
operation. 

 

 

Note! 
This  step  is  used  to  boot  the  Energy  Server  under  the  complete  power-down 
condition,  it  is  assumed  that  the  Energy  Server  has  been  installed  and  has  been 
debugged by the engineers and the external power switch is closed. 

 

Содержание GF-80000-360Vdc-380Vac-3/3

Страница 1: ...CENTAURI ENERGY SERVER User Manual Model number GF 80000 360Vdc 380Vac 3 3 Version 1 0 Release Date May 2020 Author Mamoona Khalid...

Страница 2: ...ity power supply featuring stable voltage and frequency even in the cases of a sudden change of AC input voltage and AC frequency over under voltage Legal Provisions No part of this User Manual Manual...

Страница 3: ...module panel indicators and alarm warnings 20 3 5 Introduction of Buttons 21 3 5 1 Description of Selection Button Function 21 3 5 2 Description of Function Buttons 21 3 6 Introduction of Breaker 22...

Страница 4: ...ance Bypass Operation 42 5 4 1 Precautions 42 5 4 2 Entering Service Mode 43 5 5 System Settings 44 5 5 1 Advanced Setup 44 5 5 1 1 System Mode settings 44 5 5 1 2 PV Auto Power ON Setting 45 5 5 1 3...

Страница 5: ...without notice and at the sole discretion of Kilowatt Labs Inc Kilowatt Labs Inc www kilowattlabs com 5 6 4 System Failure 53 7 Maintenance and Troubleshooting 54 7 1 Preventive Maintenance 54 7 2 Mai...

Страница 6: ...ystem Control Panel 13 Fig 4 Description of Touch Screen 15 Fig 5 Schematic Diagram of System Installation 27 Fig 6 Schematic Diagram of System Handling 28 Fig 7 Signal Interface of Remote Control 37...

Страница 7: ...Menu Icon of Touch Screen 17 Table 5 Description of Button Symbol of Touch Screen 18 Table 6 System LED and Alarm 1 19 Table 7 System LED and Alarm 2 20 Table 8 Description of Selection Buttons 21 Ta...

Страница 8: ...ersonnel After the Energy Server is turned OFF its voltage may be still high for a long time please do not open the cabinet because it may cause an electric shock The Manual Bypass switch is used for...

Страница 9: ...of Kilowatt Labs Inc Kilowatt Labs Inc www kilowattlabs com 9 In locations with unusually high or low temperatures above 40o C or below 0o C or high humidity 90 Warning 1 The Energy Server must be re...

Страница 10: ...ange without notice and at the sole discretion of Kilowatt Labs Inc Kilowatt Labs Inc www kilowattlabs com 10 2 Energy Server Overview 2 1 Part Number 1 Isolated Off Grid Type 2 Capacity of Energy Ser...

Страница 11: ...aic power generation system mainly consists of the PV Panels combiner box Energy Server Battery and Load The solar energy of the PV panels is sent to the combiner after converging solar energy is sent...

Страница 12: ...onverted by a PV switch through MPPT power module to supply to the battery and DC bus The inverter module converts the DC power of DC bus to pure AC power free from the mains interference In the event...

Страница 13: ...r Control 3 1 Control Display Panel 80KW three phase off grid Energy Server can control the off grid inverter and query all the input and output parameters battery status power generation event and al...

Страница 14: ...ontrol touch screen control mode Press Up and Down buttons to move the cursor Press the Enter button to execute an operation Table 2 Symbols Function Button symbols Names Function INV ON Power ON butt...

Страница 15: ...on Menu Name Menu Items Definition Input Parameters Line Voltage V Rectifier input line voltage Current A Rectifier input current Frequency Hz Rectifier Input frequency Power factor Rectifier Input po...

Страница 16: ...ed load percentage Parallel parameters Apparent Power KVA S out Apparent power Active power KW P out Active power Stand alone system with no parallel data When the Energy Sever is set to stand alone i...

Страница 17: ...urrent Module Status Current module status Table 4a Description of Menu Icon of touch screen Button Icons Name Functions Settings Press this button to enter system settings ON OFF Press this button to...

Страница 18: ...button to return to the previous menu of the directory Page down button Press this button to page down Page up button Press this button to page up Left shift button Press this button to move the curs...

Страница 19: ...eep once per 4 seconds Red light flashing once per 2 seconds Battery test Beep once per 2 seconds Green light steady ON No fault No beep Table 6 System LED and Alarm 1 LED Red light steady ON Green li...

Страница 20: ...e Battery test under voltage Table 7 System LED and Alarm 2 3 4 MPPT module panel indicators and alarm warnings Fig 5 MPPT Module Panel Indicators and Alarm Warnings MPPT module LED indicator Off Stea...

Страница 21: ...can move the cursor through pressing or button to choose the required control button and then press the button for confirmation 3 5 2 Description of Function Buttons Button Symbols Name Functions INV...

Страница 22: ...bypass input by switching ON this button OUTPUT Output switch Turning ON the output breaker will make a connection between the load and the system static switch BYPASS Bypass switch TURN ON the Bypas...

Страница 23: ...PV 4 Input terminals pole AC INPUT R line S line and T line of rectifier input terminal BYPASS INPUT R line S line T and N line of bypass input terminal AC OUTPUT R line S line T line and N line of sy...

Страница 24: ...Description of Remote Control Signal Input 3 9 Description of Output Signal at System Dry Contact English Name Chinese name Normally Closed Nodes Normally Opened Nodes FAN FAULT Fan fault Fan normal F...

Страница 25: ...site must be provided with the professional engineers authorized by the company for the guidance of installation Ground the Energy Sever properly and turn OFF all switches before making electrical con...

Страница 26: ...tion on the internal or external surface of the Energy Sever and the battery If there is any damage do not install or use the system please notify the carrier for disposal immediately Check the techni...

Страница 27: ...fan should be installed to ensure sufficient air flow in the room so that the equipment gets full heat dissipation in case of the rise in room temperature It is best to be equipped with A C system 2...

Страница 28: ...ews if a forklift is used to lift insert the forks of forklift into the gap between the pallet and the bottom of the cabinet refer to the reference point of the cabinet s center of gravity Lift the ca...

Страница 29: ...ensure that the distance between the battery and the Energy Sever is shortest as much as possible Sirius Module Do not charge the Module when the temperature is below 30o C Do not charge the Module w...

Страница 30: ...d capacity iii The ambient temperature iv Physical support media The qualified installation engineers should select suitable cable for connection according to local related standards and table 14 The...

Страница 31: ...of Power Cable 4 10 Energy Server Wiring Description 4 10 1 AC Mains Wiring Method Off grid solar inverter applies the lower wiring method Before wiring open the front door with the key supplied with...

Страница 32: ...BATTERY PV 1 PV 2 PV 3 PV 4 PV 5 PV 6 PV 7 PV 8 PV INPUT PV 1 PV 2 PV 3 PV 4 PV 5 PV 6 PV 7 PV 8 PV INPUT Signs Functions PV INPUT PV 1 n input terminals pole PV INPUT PV 1 n input terminals pole AC I...

Страница 33: ...dc 380Vac 3 3 This manual is subject to change without notice and at the sole discretion of Kilowatt Labs Inc Kilowatt Labs Inc www kilowattlabs com 33 Fig 8 80KW inverter System Two way mains Wiring...

Страница 34: ...em After equipment is completely positioned the input terminals of each Energy Server are connected together the output terminals are connected together The wiring diagram is shown below Fig 9 Paralle...

Страница 35: ...phase sequence and then fasten them 5 Connect the R S T and N ports of the AC INPUT rectifier input terminal board with the corresponding R S T and N ports of the external BYP INPUT power switch or b...

Страница 36: ...are completely shut down and the external switches of rectifier power supply the bypass power supply and the battery pack are switched on and then use the multimeter to test and make sure that the vo...

Страница 37: ...nsing Perform charging compensation by battery temperature coefficient BAT TEST Battery self test Short circuit 0 2 s The Energy Server performs battery test INV ON Energy Server power ON In standby m...

Страница 38: ...mally closed contact 4 13 Parallel Signal Port Each Energy Server has four parallel cable ports two are DB25 and other two are DB9 In the parallel system when connecting parallel cables of DB25 as wel...

Страница 39: ...parts for the user Only the maintenance support personnel authorized by the company can open the protective cover plate of Energy Server 5 1 2 Power ON Steps 1 Switch ON the output switch of the batte...

Страница 40: ...e Energy Server 2 Switch OFF the output switch 3 Switch OFF the switches of PV n in turn 4 Switch OFF the RECTIFIER and BYPASS switches of the Energy Sever 5 Switch OFF the DC START switch of the Ener...

Страница 41: ...l system are all closed and the output terminals are all connected together 5 1 5 Power OFF Procedures Parallel system 1 Turn OFF all loads of the total output of parallel system 2 Tap the ON OFF icon...

Страница 42: ...gy Sever overload being more than or equal to 150 DC BUS instantaneous overvoltage abnormal protection etc please confirm that the fault has disappeared according to the prompt of the alarm informatio...

Страница 43: ...switch to turn it ON at this point the maintenance bypass power supply and inverter static bypass power supply are in parallel to power the load 3 Press the OFF button on the panel and then click OK b...

Страница 44: ...press button in the main interface to enter INV Settings Go to Manual Bypass interface successively to select OFF option and click YES button At this point the maintenance steps have been completed a...

Страница 45: ...ing The battery parameter settings will affect the reliability and security of the system and may cause damage to the battery Please be sure to enter the actual data of the system to ensure the safe u...

Страница 46: ...Configuration Settings Tap Temperature Compensation to enter the default setting of the system is 2mV C the engineer can select an appropriate parameter according to the battery s characteristic requ...

Страница 47: ...he original user settings will be completely cleared Please conduct the operations above carefully If the operation is necessary be sure to set the relevant parameters according to the requirements of...

Страница 48: ...urrent charging 5 5 2 4 Protocol Settings The protocol settings are used to setup the 485 communication protocol The following three items can be set 1 Address It is 1 by default 2 Baud rate It is 240...

Страница 49: ...of Kilowatt Labs Inc Kilowatt Labs Inc www kilowattlabs com 49 5 5 2 9 Touch Screen Calibration Touch screen calibration is used to calibrate the center point of the screen When the system is restored...

Страница 50: ...rmal 1 When PV Power is higher than load power it will supply power to the load first and the extra power will be used to charge the battery In this case if PV charge current is high enough AC will no...

Страница 51: ...ils the PV power will support the load first and the extra power will be used to charge the battery Fig 14 AC Abnormal Mode 1 2 When the PV power is less than the load power and AC fails the PV togeth...

Страница 52: ...ery low voltage in power supply priority mode the rectifier will turn OFF AC charger in set time PV and rectifier will supply the load first and PV extra power will be used to charge the battery Fig 1...

Страница 53: ...53 3 Energy storage priority Energy Server will turn on rectifier according to user settings Load and battery will be supplied by PV and rectifier Fig 18 Off Peak Setup Mode 3 6 4 System failure 1 Wh...

Страница 54: ...equency of the battery and the temperature rise Even if the battery is not used its performance will gradually decline therefore it is recommended that one discharge test Make sure the battery test sh...

Страница 55: ...to 0 5 1 year 4 With ageing of the battery the performance of the battery gets poor When the battery health drops down to about 80 of the initial value the discharge time decreases accordingly The ba...

Страница 56: ...not less than 150 and the overload time is finished or the inverter is shut down for protection Output Over Load The load is more than 105 Get the load shedding to be less than 90 REC Fault After the...

Страница 57: ...h the requirements of the Energy Server and whether the switches are in normal operation BYP Phase Abnormal The bypass phase sequence is reverse Adjust any two phases of the system input lines Bypass...

Страница 58: ...tton for recovery EPO Press the red button on the panel or conduct the remote EPO operation Remove the remote EPO order and execute the OFF operation steps and then execute the ON steps after the syst...

Страница 59: ...k the local authorized technician for service Over Current The power of PV polar plate is too high and there is instant overcurrent Check whether the power of the polar pole confirms to the system rat...

Страница 60: ...ates in series PV under voltage Poor illumination Confirm the direction and the pavement gradient of the polar plate MPPT is not detected MPPT shutdown of the communication blackout The MPPT system sh...