![Kilews KFA-0820A Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/kilews/kfa-0820a/kfa-0820a_instruction-manual_1966882016.webp)
13
OPERATION METHOD
LOAD SCREWS INTO CHAMBER
Turn off the power first, and open the Top Cover Box. Ensure the screws are loaded
without foreign materials, pour in screws until they come up to 1~2mm below the top
on both sides of the rails.
All objects other than applied screw are deemed as foreign material which should be
removed first; or it will affect the performance of this machine.