3-66 Basic Operations
TOS9200/9201
(Explanation of the program example)
At Step 00, Memory ACW01 (AC withstanding voltage test) is conducted. Then, 0.5
second later, at Step 01, DCW01 (DC withstanding voltage test: available with the
TOS9201 only) is conducted. The Step-01 interval time is set to HOLD. Thus, Step
02 does not start until the START switch is pressed. When START is pressed, IR01
(insulation resistance test) ends at Step 02 and, 0.5 seconds later, the tester enters
the READY status.
When END is set to RET, the test restarts at Step 00.
3.13.1 Creating and editing a program
On the program screen (AUTO), recall the number of the program to be created or
edited. Press the SHIFT + AUTO/EDIT keys. The program edit screen will then
appear, with “EDIT” displayed at the top right. The program is stored as it is created
or edited.
If a program is to be created or edited, the following settings must be made:
• Program name
• Memory number (step settings)
• Interval time
• Repeat-test settings
AUTO
AUTO
PRG
00 : --UNTITLED--
01 ACW00-1.0s
02 DCW02-1.0s
03 IR 03-1.0s
NAME :
--UNTITLED--
HIVOLT : 5.00kV S:50% 50Hz
LOW-UP : 0.1-100mA
TIMER :
0.1-999-0.1
CH :
EDIT
INS
DEL
Program name
Setting display window
Program status
Program No.
Program display
Step number
Repeat-test settings
Deletion of program steps
Interval time
Insertion of program steps
Memory No.
Содержание TOS9200
Страница 22: ...P 10 Preface TOS9200 9201...
Страница 116: ...3 78 Basic Operations TOS9200 9201...
Страница 130: ...4 14 Using Terminals and Connectors TOS9200 9201...
Страница 148: ...7 4 Maintenance TOS9200 9201...
Страница 162: ...8 14 Specifications TOS9200 9201...
Страница 170: ...I 4 Index TOS9200 9201...
Страница 171: ......