8-6 Maintenance and Calibration
PLZ-4W
8.3.2
Preparation
Leave the PLZ-4W turned on for at least 30 minutes (warm-up) before carrying out
a performance check. This is to reduce measurement errors due to initial drift. Keep
the ambient temperature at 23
±
5
°
C.
Table8-1
Test equipment used
Connect the cables as shown in Fig. 8-5. Select the shunt resistor according to the
calibration item.
Fig. 8-5
Connection diagram
Name
Required accuracy
Required rating
DC voltmeter
Within 0.02 %
Measurement voltage range:
0 V to 155 V
Shunt resistor
0.1 %
For 0.5 A (*1)
For 1 A (*1, *2)
For 2 A (*3, *4)
For 5 A (*1)
For 10 A (*2)
For 20 A (*3, *4)
For 50 A (*1)
For 100 A (*2)
For 200 A (*3, *4)
Regulated DC power supply
(constant voltage power supply)
–
Voltage: 5 V
Current: 33 A (*1)
66 A (*2)
132 A (*3)
200 A (*4)
Regulated DC power supply
(constant current power supply)
–
Voltage: 155 V
Current: 0.3 A
*1:PLZ164W/PLZ164WA, *2:PLZ334W, *3:PLZ664W, *4:PLZ1004W
Regulated DC
power supply
Voltmeter
(DVM)
Voltmeter
(DVM)
PLZ-4W Series
Electronic Load
+S
–S
+
–
I
1
V
1
Shunt resistor
+
–
Содержание PLZ-4W Series
Страница 10: ...VIII Contents PLZ 4W ...
Страница 20: ...1 10 General Information PLZ 4W ...
Страница 38: ...2 18 Installation and Preparation PLZ 4W ...
Страница 90: ...5 30 Basic Operation PLZ 4W ...
Страница 192: ...9 10 Specifications PLZ 4W ...
Страница 214: ...A 22 Appendix PLZ 4W ...